Golf Gate 2 Construction Update - March 2026
March 2026 Inspection Confirms Golf Gate 2 Reaches 60.02% Construction Progress at DAMAC Hills
With the concrete structure substantially complete, Golf Gate 2 has moved into internal, external, and MEP finishing works, recorded at 60.02 percent on 25 March 2026.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Golf Gate 2 Construction Snapshot
A 16.77 point rise since the previous inspection carries Golf Gate 2 through the envelope and MEP band, the stage where the completion linked installments in the payment plan move from theory into range.
Golf Gate 2 at DAMAC Hills
2698
Active
60.02%
25 March 2026
03 August 2023
464 apartments
78,793.05 sq m
No date recorded in the DLD register
Data source: RERA independent progress monitoring report conducted on 25 March 2026, tracked against DLD inspection records for project 2698, developer DAMAC Crescent Properties. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: July 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else.
This Inspection Cycle
Golf Gate 2 Construction Progress Summary
Golf Gate 2 moved from 43.25% at the previous inspection to 60.02% on 25 March 2026, a 16.77 point gain earned in the cycle that took the concrete frame to substantially complete. The tower is no longer being raised: it is being fitted out, floor by floor, behind a structure that the inspection record now treats as settled.
- Site mobilization and enabling works on plot 2128
- Concrete frame across ground, two podium levels, and 27 residential floors
- Structural works recorded as substantially completed in the March 2026 report
- Internal works and finishes across the 464 apartments
- External works and facade packages on the golf facing elevation
- MEP installation recorded at advanced stages
- Site external works progressing at different stages around the tower
- Remaining RERA inspection cycles from 60.02% toward 100%
- Building completion certificate procedures
- Handover against the developer's stated Q4 2026 target
Payment Linked Progress
What 60.02% Progress Means for Golf Gate 2 Buyers
The published Golf Gate 2 plan is a 20/60/20 schedule, and its construction tranche mixes roughly 1% monthly installments with milestone payments called at the 70%, 80%, and 90% completion marks. A verified reading of 60.02% therefore sits just short of the first of those calls, which makes this cycle a payment question as much as a progress one. Four actions matter at this stage.
Verify the escrow account
Every payment ahead of handover belongs in the DLD regulated escrow account registered for project 2698, recorded in the March 2026 monitoring report as held with Dubai Islamic Bank. Golf Gate 2 escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record, where the developer is registered as DAMAC Crescent Properties.
Reread your SPA milestone schedule
The published plan calls 2% at the 70% completion milestone, 2% at 80%, 1% at 90%, and 20% on completion, but your own sale and purchase agreement is the document that governs which of those apply to your unit. Not sure which installments this 60.02% reading brings into range? Send me your SPA schedule and I will map it against the certified milestones.
Line up the snagging window
At 60.02% the pre handover inspection window is not open yet; it opens once a project passes roughly 70% recorded progress or comes within a few months of handover. The Golf Gate 2 snagging inspection guide sets out what to arrange before the handover notice lands.
Track the remaining cycles
With 39.98 points still to be certified, several inspection readings remain between this record and completion. The Golf Gate 2 construction updates hub records each one as it publishes.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 60.02%?
Entering here means the structural phase is already certified and the community around the plot is already finished, so what remains to be judged is finishing quality and a short payment runway rather than years of delivery risk. Every payment goes to the DLD-registered escrow account for project 2698, released against certified construction progress.
- Structure recorded substantially complete on 25 March 2026
- Most of the 60% construction tranche sits behind the current position
- DAMAC Hills already operating around the site: schools, retail, golf club
- Construction risk carried from excavation through to handover
- Two to four years of waiting is the usual delivery horizon
- Longer installment runway, priced at launch levels
The project page lists limited availability on request as of this update; availability shifts between cycles.
About the Development
Golf Gate 2 Project Details

With the frame topped out and finishing works underway, Golf Gate 2 is a single G+2P+27 tower of 464 one and two bedroom apartments on the golf facing edge of DAMAC Hills. Starting prices: AED 818K ≈ USD 223K.
For buyers entering at this reading, the trade off is a short runway to the 20% completion payment against a masterplan that is already built and operating, with handover targeted by the developer for Q4 2026.
Golf Gate 2 at DAMAC Hills Project GuideSite Context This Cycle
Explore Golf Gate 2 Location on Dubai Map
Golf Gate 2 stands on plot 2128 in Al Hebiah Third, on the golf facing edge of the DAMAC Hills apartment zone rather than inside the villa clusters, and that orientation shapes this cycle directly: the fairway elevation is the exposed face of the building, so its external and facade packages are the works most visible from the course while internal finishing runs floor by floor behind them.
Because DAMAC Hills is a completed community, with the Trump International Golf Club, schools, supermarkets, and Malibu Bay already operating, Golf Gate 2 is finishing into a working neighbourhood rather than an emerging one, which matters for anyone weighing occupancy or a first tenancy against the Q4 2026 handover target. See the project's position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Golf Gate 2 As Finishing Works Advance
The envelope and MEP band is where payment protection, residency planning, and handover preparation all need checking at once. Each resource below is matched to where Golf Gate 2 stands right now.

Golf Gate 2 Construction Updates
This page: the verified March 2026 inspection record for Golf Gate 2, structure through finishing works.
Golf Gate 2 Golden Visa
Golf Gate 2 pricing sits below the AED 2M residency threshold; the guide maps the routes.
Read the Golf Gate 2 Golden Visa Guide
Golf Gate 2 Escrow Account
Confirm the DLD-registered escrow account for project 2698 before releasing any further construction installments.
Verify the Golf Gate 2 Escrow Account
Golf Gate 2 Snagging Inspection
At 60.02% recorded progress, line up independent defect documentation before the Golf Gate 2 handover notice.
Book Golf Gate 2 Snagging InspectionUpdate Timeline
Other Golf Gate 2 Construction Updates
This is the first inspection record published for Golf Gate 2 on the hub. Each new RERA reading is added as it is released, so the timeline builds cycle by cycle through to handover.
Where This Update Fits
Explore Golf Gate 2 Structure
This monthly record is one node in a wider picture: the master community that surrounds the plot, the developer certifying each milestone, and the resale stock that prices against it.

DAMAC Hills Villas and Townhouses for Sale
Compare the villa and townhouse resale prices that anchor apartment values across the wider DAMAC Hills.
DAMAC Hills Villas and Townhouses for Sale
About DAMAC Hills Master Community
See how the golf club, schools, and Malibu Bay shape daily life around Golf Gate 2.
DAMAC Hills Community GuideDAMAC Properties Developer Profile
Review DAMAC's delivery record across DAMAC Hills before your next construction linked payment decision.
DAMAC Properties Developer ProfileFAQs
Golf Gate 2 Construction Progress in March 2026: Frequently Asked Questions
The RERA independent progress monitoring report dated 25 March 2026 records Golf Gate 2 at 60.02% construction progress under DLD project number 2698, with the project status listed as active and the main contract shown as progressing.
Golf Gate 2 moved from 43.25% at the previous inspection to 60.02% on 25 March 2026, a gain of 16.77 points. That cycle is where the concrete structure was recorded as substantially completed, with internal, external, MEP, and finishing works then progressing at advanced stages.
As of the March 2026 record, the completion field for project 2698 returns a system null value rather than a date, so no registered completion date can be quoted from the register. DAMAC states a Q4 2026 handover, which is a developer target and not a figure carried in the DLD record. How inspection cycles lead into completion certification is covered on the Golf Gate 2 construction updates hub.
The 25 March 2026 inspection notes record structure works as substantially completed across the G+2P+27 tower, with internal works, external works, MEP, and finishes all progressing at advanced stages, and the external works around the plot at differing stages of completion.
Not by itself. The published 20/60/20 plan links milestone installments to the 70%, 80%, and 90% completion marks, and the 25 March 2026 reading of 60.02% sits below the first of them. The roughly 1% monthly installments inside the construction tranche run against dates measured from the sale date rather than against progress, and the individual SPA governs both in every case.
Not yet, but it is close. The practical booking window opens once a project passes roughly 70% recorded progress or comes within a few months of expected handover, and at 60.02% on 25 March 2026 Golf Gate 2 sits below that mark. With a Q4 2026 handover targeted by the developer, the useful step now is to have an independent inspection lined up so it can be booked as the next readings publish.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the March 2026 inspection record for Golf Gate 2 correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.