Emaar · The Oasis · Construction Update
Lavita at The Oasis Construction Update - June 2026
June 2026 Inspection Records Lavita at The Oasis at 20.13% Construction Progress
Enabling, foundation, structural, MEP and internal works are advancing at different stages across Lavita's mansion plots, certified at 20.13 percent in the June 2026 RERA inspection.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Lavita at The Oasis Construction Snapshot
A 10.13 point rise over the previous DLD reading of 10% carries Lavita at The Oasis just past the foundation band into early superstructure, the stage at which each certified reading starts to count toward the construction linked instalments ahead.
Lavita at The Oasis by Emaar
3266
Active
20.13%
02 June 2026
01 October 2024
49 mansions
123,286.46 sq m
Q1 2029
Data source: RERA Independent Progress Monitoring Report for the site inspection conducted on 02 June 2026, DLD project 3266, registered as The Oasis - Lavita under developer EMAAR PROPERTIES (P.J.S.C), tracked against DLD inspection records. The hero image is a developer rendering of a planned Lavita mansion, not a site photograph, and no progress is read from it. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Lavita at The Oasis Construction Progress Summary
The DLD record lifts Lavita at The Oasis from a previous reading of 10% to 20.13% at the 02 June 2026 inspection, a 10.13 point gain; because the register gives no date for the earlier reading, no monthly pace can be drawn from the pair. Counted from the recorded construction start on 01 October 2024, the site reached this reading about 20 months into the build, with the inspector noting that mobilization was still ongoing while several work packages advanced in parallel.
- Project registration in the DLD register on 10 September 2024
- Construction start recorded on 01 October 2024
- Earlier certified RERA reading of 10%, now superseded
- Site mobilization, still ongoing at the time of inspection
- Enabling and foundation works, at different stages across the plots
- Concrete structure and blockwork of the mansions, each set over a basement
- MEP and internal works, progressing at different stages
- Infrastructure works within the project
- Structure up to first floor and, on the larger designs, roof level
- Internal and external finishes across all 49 mansions
- Amenity works: canals, gym, play areas, gatehouses and clubhouse
- Completion certificate and handover in Q1 2029
Payment Linked Progress
What 20.13% Progress Means for Lavita Buyers
Lavita's launch schedule of record ties four instalments to construction stages (50%, 70%, 90% and 100% completion), each paired with an estimated date, so a certified 20.13% is the reading that shows how far the site sits from the next one. At this early superstructure stage, four actions matter most.
Verify the escrow account
Every remaining instalment belongs in the DLD regulated escrow account for project 3266, which the RERA report places with Abu Dhabi Commercial Bank. Lavita at The Oasis escrow account verification comes before any transfer, and the lookup takes about two minutes against the official DLD project record.
Match your SPA to certified stages
Check whether your sale and purchase agreement calls the construction linked instalments on the certified percentage or on the estimated date, which the schedule of record sets at September 2026 for the 50% stage. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the certified milestones.
Log each new reading
With 79.87 points still to certify, many RERA cycles lie ahead, and the Lavita at The Oasis construction updates hub records each one so a stalled reading is visible before any payment call.
Keep Oqood and receipts in order
Confirm your mansion is registered on Oqood, the DLD interim register for off plan purchases, and that every payment receipt names project 3266, since these records carry weight if a milestone call is ever disputed.
General framework, not legal advice: instalment triggers, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 20.13%?
Entering Lavita at this reading means committing while the mansions are still rising from their basements: the long runway to Q1 2029 is the advantage, and construction risk is what the escrow structure exists to contain. Every payment goes to the DLD-registered escrow account for project 3266, released against certified construction progress.
- A certified 20.13% reading with main contract works progressing
- Handover scheduled for Q1 2029, more than two years out
- All four construction linked stages of the schedule of record still ahead
- Pricing set before any construction is certified
- The full build, from excavation up, still ahead of the buyer
- Instalment runway starting at booking, often spread over years
43 units listed available on the project page as of this update; availability shifts between cycles.
About the Development
Lavita at The Oasis Project Details

With foundation and structural works still at different stages across its plots, Lavita at The Oasis is an early stage build of 49 six and seven bedroom mansions, each designed over a basement level, set along the canals of The Oasis. Starting prices: AED 36.61M ≈ USD 9.97M.
Entering now trades certainty for runway: most of the structure is still to be certified, and the construction linked instalments in the launch schedule of record all sit ahead of handover in Q1 2029.
Lavita at The Oasis Project GuideSite Context This Cycle
Explore Lavita at The Oasis Location on Dubai Map
Lavita sits on plot 1212 in Me'Aisem Second, a long curving strip on the outer edge of The Oasis where the mansion plots run between internal canals and a perimeter green belt. Every design carries a basement, so foundation and basement structure are spread across many separate plots at once, which fits the June 2026 notes describing works at different stages rather than a single advancing front.
Around Lavita, The Oasis master community of canals and lagoons, spanning 100 million sq ft with over 7,000 residences, is still being built out, and the June 2026 notes list infrastructure works as progressing inside the project itself. Buyers at this stage are committing to a district that matures alongside the mansions, reached via the D54 and E44 with Arabian Ranches about 8 minutes away. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Lavita at The Oasis During Early Construction Progress
Early superstructure is when payment protection, instalment timing, and residency planning are settled, long before handover comes into view. Each resource below matches where Lavita stands at 20.13%.

Lavita at The Oasis Construction Updates
This page: the verified June 2026 inspection record for Lavita, read against its construction linked instalments.

Lavita at The Oasis Golden Visa: One Mansion, Many Times Over
Lavita at The Oasis is Emaar's freehold collection of 49 mansions, and both its 6 and 7 bedroom tiers qualify individually.
Read Lavita at The Oasis Golden Visa Guide
Lavita at The Oasis Escrow: An Intimate 49-Unit Account
Lavita at The Oasis puts 49 units in Abu Dhabi Commercial Bank escrow as DLD project 3266, certified 20.13% June 2026.
Verify Lavita at The Oasis Escrow AccountUpdate Timeline
Other Lavita at The Oasis Construction Updates
June 2026 opens the monthly Lavita series, so there is no earlier monthly report to step back to; each later DLD reading gets its own report, linked from this timeline and from the construction updates hub.
Where This Update Fits
Explore Lavita at The Oasis Structure
This June report is one entry in a wider record: the mansion and villa market Lavita competes with, the canal community being built around it, and the developer carrying its construction.

The Oasis Emaar Properties for Sale
Browse waterfront villas and mansions for sale across The Oasis clusters, with prices, layouts and payment plans.
See The Oasis Emaar Properties for Sale
The Oasis by Emaar: Lagoon Villas and Mansions in Dubailand
The Oasis holds about 3,100 villas and mansions in Dubailand, with more than 40 percent of its land given to lagoons.
Explore the The Oasis Emaar Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileFAQs
Lavita at The Oasis Construction Progress in June 2026: Frequently Asked Questions
The RERA inspection of 02 June 2026 puts Lavita at The Oasis at 20.13% construction progress in the DLD project register, which lists the project as The Oasis - Lavita under project number 3266. That is 10.13 points above the previous inspection reading of 10%, and the progress status on the same report reads Main Contract - Progressing.
The June 2026 record gives no sign of a revised date: the DLD register lists completion as 31 January 2029, consistent with handover in Q1 2029, and 79.87 percentage points remain between the 02 June 2026 reading and full completion, about 32 months before the registered date. Because the earlier 10% reading carries no date, the pace can only be judged as further dated readings are published. How inspection cycles lead to completion certification is covered on the Lavita at The Oasis construction updates hub.
Yes. The completion date in the register is not fixed, and a revised date can be recorded at any later inspection cycle, for example when site works are resequenced or fall behind. The date shown here is the record as of the 02 June 2026 inspection; any revision would be stated plainly in a later monthly update for Lavita.
The 02 June 2026 inspection notes record that mobilization was still ongoing, with enabling works, foundation works, structure, and MEP and internal works progressing at different stages, and infrastructure works also progressing. The mansions are designed as concrete structures with blockwork and internal and external finishes, each set over a basement level, so the spread of works reflects many separate plots at different points in their build.
At the 02 June 2026 reading of 20.13%, Lavita was 29.87 points short of the 50% construction completion stage that the launch schedule of record links to its fourth 10% instalment, which carries an estimated date of September 2026. Whether that instalment falls due on the certified percentage or on the estimated date is set by each buyer's SPA, so the two can diverge if progress runs behind the estimate.
The DLD app lists a previous inspection reading of 10% next to the 02 June 2026 figure of 20.13%, but it does not show when that earlier inspection took place, so the 10.13 point gain cannot be converted into points per month. Measured from the recorded construction start of 01 October 2024, the site reached 20.13% about 20 months into the build, and the next dated reading will allow a true pace to be calculated.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the June 2026 inspection record for Lavita at The Oasis correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.