LUMENA by OMNIYAT by OMNIYAT in Business Bay project rendering used for the March 2026 construction update showing the planned sky pool and landscaped terraces with Burj Khalifa view in Dubai - Presented by Tohid Fetrat

OMNIYAT · Business Bay · Construction Update

LUMENA by OMNIYAT Construction Update - March 2026

March 2026 DLD Register Reading Places LUMENA by OMNIYAT at the 0% Baseline in Business Bay

Site activity at LUMENA had not started when RERA inspected plot 139 on 25 March 2026; the background image is a developer rendering, not site progress.

Direct advisor access. Every message answered personally, never by a call center.

0%DLD Register Reading
25 March 2026Inspection Date
Q4 2029Expected Handover
3758DLD Project Number

DLD Project Register Data

LUMENA by OMNIYAT Construction Snapshot

A 0% baseline in the DLD register on 25 March 2026 places LUMENA at the enabling and foundations stage, where escrow, Oqood and the calendar of the payment plan matter more than any progress figure.

Project Name

LUMENA by OMNIYAT

Project Number

3758

Project Status

Active

Construction Progress

0%

Inspection Date

25 March 2026

Construction Start

31 December 2025

Total Units

99 Offices

Total Built Area

62,391.42 sq m

Expected Completion

Q4 2029

Data source: DLD project register reading for project 3758 dated 25 March 2026, read with the RERA inspection report of the same date. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Reading age when this page was prepared: 184 days; re-verify project 3758 on Dubai REST before publishing. Last updated: March 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

LUMENA by OMNIYAT Construction Progress Summary

The RERA inspection of 25 March 2026 found that no construction activities had been started on plot 139, its progress indicator reads N/A, and the DLD register records 0% for the same date. The register lists a construction start of 31 December 2025; both dates are shown here as recorded.

Recorded
  • DLD registration as project 3758 on 16 July 2025
  • Trust account bank on the inspection report: Dubai Islamic Bank (PJSC)
  • Registered construction start of 31 December 2025
Baseline at 0%
  • No construction activities started at the 25 March 2026 inspection
  • Inspection photograph: a cleared, level plot with Business Bay towers behind
  • RERA progress indicator reads N/A on the March 2026 report
Ahead of Handover
  • Excavation and foundations for the 7 basement levels
  • Superstructure of G + 45 floors + roof to 260 metres
  • Handover in Q4 2029, registered completion date 30 December 2029
Next inspectionPublished in the DLD project register after the next RERA site visit; the March 2026 record sets no date for it.
Completion targetHandover scheduled for Q4 2029; the DLD register shows a registered completion date of 30 December 2029.
Remaining distance100 percentage points separate the 25 March 2026 baseline reading from handover readiness.

Payment Timing at the Baseline

What 0% Progress Means for LUMENA Buyers

LUMENA's 50/50 plan runs on the calendar from the SPA effective date rather than on construction milestones, so a 0% register reading does not pause instalments: half the price falls due during construction and half on the project completion date. At this baseline, four actions matter most.

Before Each Instalment

Verify the escrow account

Every instalment should go only to the DLD regulated escrow account registered for project 3758 with Dubai Islamic Bank (PJSC). LUMENA by OMNIYAT escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.

Before the Next Calendar Date

Reread your SPA payment schedule

Check how your sale and purchase agreement dates the instalments that follow the SPA effective date and how it defines the project completion date, then set those clauses against a register that read 0% on 25 March 2026. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.

After the SPA Is Signed

Confirm your Oqood registration

Off plan purchases in Dubai are entered on the DLD interim register, known as Oqood, against the project number. Checking that your office appears under project 3758 turns a signed SPA into a recorded interest while the plot is still at the baseline.

Every Cycle

Watch for the first reading above zero

Each later register reading will show whether site works have been recorded on plot 139. LUMENA by OMNIYAT construction updates logs every dated reading from this baseline toward the Q4 2029 handover.

General framework, not legal advice: instalment dates, registration steps, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at the 0% Baseline?

Entering LUMENA before any recorded site works trades construction certainty for the longest payment runway: half of the price spreads across time-based instalments during construction and half waits for the project completion date. Every payment goes to the DLD-registered escrow account for project 3758, released against verified construction progress.

Entering at the 0% Baseline
  • Register reads 0% on 25 March 2026, with no construction activities started
  • Handover scheduled for Q4 2029
  • 50% of the 50/50 plan due on the project completion date
Typical Late Stage Entry
  • Structure standing and on the record before any payment
  • A short wait between purchase and handover
  • Remaining balance compressed into fewer, larger payments
From AED 27.38M ≈ USD 7.45MStarting Price
50/50 Payment Plan50% Due on Completion
Q4 2029Expected Handover
Ask What Is Available at LUMENA

Availability is not quoted on this page: OMNIYAT releases offices itself, and what is open shifts between inspection cycles.

About the Development

LUMENA by OMNIYAT Project Details

LUMENA by Omniyat office tower rooftop terrace with lounge seating and illuminated architectural facade overlooking Dubai skyline at night - Presented by Tohid Fetrat
Business Bay · OMNIYAT

With no construction activities recorded at the March 2026 inspection, LUMENA is a pre-construction commercial tower of 99 offices, planned by OMNIYAT as 7 basements + G + 45 floors + roof rising to 260 metres, with offices delivered shell and core. Starting price: AED 27.38M ≈ USD 7.45M.

For buyers entering at the baseline, the trade off is the longest wait on the schedule against half of the price held back until the project completion date, with handover scheduled for Q4 2029.

LUMENA by OMNIYAT Project Guide

Site Context This Cycle

Explore LUMENA by OMNIYAT Location on Dubai Map

LUMENA holds plot 139 at the western gateway of Business Bay beside Sheikh Zayed Road, and the RERA inspection photograph of 25 March 2026 shows that plot cleared and level with Business Bay towers standing directly behind it. With seven basement levels planned beneath the tower, the earliest works a later reading could record sit below ground.

Because Business Bay already runs on completed roads and utilities, with the Business Bay Metro Station the developer's brochure links to LUMENA, the tower starts inside a working business district rather than ahead of one, which matters for firms weighing an owned headquarters against the Q4 2029 handover. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view LUMENA by OMNIYAT on Dubai Map

Buyer Resources for This Project

Investing in LUMENA by OMNIYAT at the Pre-Construction Stage

Before the first recorded works, residency questions and instalment protection come ahead of handover planning. Each resource below is matched to where LUMENA stands right now.

LUMENA by OMNIYAT by OMNIYAT in Business Bay construction updates cover image featuring a project rendering of the office tower with illuminated curved facade and Burj Khalifa skyline at night in Dubai - Presented by Tohid Fetrat
You Are Here

LUMENA by OMNIYAT Construction Updates

This page: the 25 March 2026 inspection record for LUMENA, read against its 0% register baseline.

LUMENA by OMNIYAT by OMNIYAT in Business Bay Golden Visa graphic with a gold visa card beside the office tower and panoramic city view in Dubai - Presented by Tohid Fetrat

LUMENA by OMNIYAT Golden Visa: Three Office Tiers, One Commercial Question

LUMENA, OMNIYAT's 99-office Business Bay tower, sits above AED 2M at every tier, subject to ICP and DLD confirmation.

Read LUMENA by OMNIYAT Golden Visa Guide
LUMENA by OMNIYAT by OMNIYAT in Business Bay escrow account graphic with shield and padlock icons above an illuminated tower terrace at night in Dubai - Presented by Tohid Fetrat

LUMENA by OMNIYAT: The Business Bay Escrow Account

OMNIYAT's LUMENA in Business Bay is DLD project 3758, 112 units held in Dubai Islamic Bank escrow, certified 0% March 2026.

Verify LUMENA by OMNIYAT Escrow Account

Update Timeline

Other LUMENA by OMNIYAT Construction Updates

This March 2026 baseline is the first LUMENA reading published on this site; each later reading joins the hub as it publishes.

All LUMENA by OMNIYAT Construction Updates

FAQs

LUMENA by OMNIYAT Construction Progress in March 2026: Frequently Asked Questions

The Dubai Land Department project register shows LUMENA by OMNIYAT, project 3758, at 0% as of the inspection dated 25 March 2026, and the inspection notes of that date record that no construction activities had been started. The reading was 184 days old when this page was prepared, so the current figure should be re-verified on Dubai REST.

The March 2026 record shows no change to the dates: handover remains scheduled for Q4 2029, and the DLD register lists a registered completion date of 30 December 2029, which falls inside that quarter. With the register at 0% on 25 March 2026, 100 percentage points of recorded progress separate this reading from handover readiness. How each inspection cycle feeds the record is covered on the LUMENA by OMNIYAT construction updates hub.

The inspection of 25 March 2026 found that no construction activities had been started on plot 139, and the inspection photograph shows a cleared, level plot with Business Bay towers behind it. The RERA progress indicator on that report reads N/A, while the DLD register records 0% for the same date.

As of the 25 March 2026 inspection, the register records LUMENA as registered on 16 July 2025, with a registered construction start of 31 December 2025 and a registered completion date of 30 December 2029. The same inspection recorded that no construction activities had been started. Each date is shown here exactly as the register records it.

No. LUMENA's 50/50 plan is time-based rather than tied to a construction percentage: 5% on the booking form effected date, 15% on the SPA effective date, 10% six months later, 5% each at 12, 18, 24 and 30 months from the SPA effective date, and 50% on the project completion date. A 0% reading in March 2026 does not move those dates; the SPA you sign is what binds them.

The inspection report describes the project as 7 basements + G + 45 floors + roof, so the earliest works a later reading could record sit below ground: excavation, shoring and foundations for the basement levels typically precede any visible superstructure. The March 2026 record gives no date for those works.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the March 2026 inspection record for LUMENA correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts