Meriva Sunset by Ellington Properties in The Meriva Collection project rendering used for the February 2026 construction update showing curved residential buildings, landscaped grounds and a swimming pool in Dubai - Presented by Tohid Fetrat

Ellington Properties · Dubai Islands · Construction Update

Meriva Sunset Construction Update - February 2026

February 2026 Inspection Sets a 0% Baseline for The Meriva Collection, Home of Meriva Sunset

Inspectors found no construction activities under way on The Meriva Collection plot on 25 February 2026, opening the Meriva Sunset record at a 0% register baseline.

Direct advisor access. Every message answered personally, never by a call center.

0%DLD Register Reading
25 February 2026Inspection Date
Q2 2030Expected Handover
4346DLD Project Number

DLD Register Inspection Data

Meriva Sunset Construction Snapshot

A first reading of 0%, dated 25 February 2026, placed Meriva Sunset at the very start of the enabling and foundations band, where escrow checks and Oqood registration carry more weight for buyers than any site figure.

Project Name

Meriva Sunset

Project Number

4346

Project Status

Active

Construction Progress

0%

Inspection Date

25 February 2026

Construction Start

03 April 2026

Total Units

377 Residences in Meriva Sunset

Total Built Area

144,845.68 sq m

Expected Completion

31 December 2031

Data source: DLD project register for project 4346, which covers The Meriva Collection as a whole, reading dated 25 February 2026; by 29 September 2026 that reading was 216 days old, so re-check the live register before relying on it. The hero image above is a developer rendering, not a site photograph. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: February 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

The February 2026 Reading

Meriva Sunset Construction Progress Summary

The February 2026 figure belongs to DLD project 4346, a single register record for all of The Meriva Collection; its registered scope includes a basement-plus-ground-plus-20 high-rise residence, matching the developer's configuration for Meriva Sunset. With no construction activities started at that inspection, the record had nothing earlier to compare against, and every later reading will be measured from this point.

On the Record
  • DLD project 4346 registered on 14 April 2026, status Active
  • Registered construction start of 03 April 2026
  • Trust account bank on the inspection report: Sharjah Islamic Bank
Recorded at 0%
  • No construction activities started at the 25 February 2026 inspection
  • Progress status shown as N/A on the inspection report
  • One collection-wide reading shared by Meriva Sunset and the rest of The Meriva Collection
Ahead of Handover
  • Meriva Sunset itself: a ground floor, 20 residential floors and a rooftop over a basement, served by 6 lifts
  • Instalments due on completion of 20%, 30%, 40% and 50% construction of the project
  • Handover expected in Q2 2030 per the developer
Next inspectionNo later reading or date was supplied with this record; the next figure will appear in the DLD register for project 4346.
Completion targetQ2 2030 handover per the developer; the DLD register shows a registered completion date of 31 December 2031.
Remaining distance100 percentage points over 2,135 days from the 25 February 2026 reading to the registered completion date, about 1.41 points per 30-day month (arithmetic, not a forecast).

Payment Linked Progress

What 0% Progress Means for Meriva Sunset Buyers

The Meriva Sunset plan is 70/30 and mostly time-linked: 20% at booking, then 10% and four 5% payments between 60 and 360 days after reservation, all running from each buyer's own reservation date regardless of site progress. Four further 5% instalments follow construction milestones, and none of them had been triggered at the 0% reading. At this stage, four actions matter most.

Before Every Transfer

Verify the escrow account

Half of the price falls due within 360 days of booking, so every transfer should go only to the DLD regulated escrow account registered for project 4346 at Sharjah Islamic Bank. Meriva Sunset escrow account verification sets out the check; the lookup itself takes about two minutes against the official DLD project record.

Before You Sign

Reread your SPA milestone schedule

Check how your sale and purchase agreement words the four construction-linked instalments and the handover notice, and map them against the Q2 2030 handover. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.

After SPA Execution

Confirm your Oqood registration

Once the signed SPA is executed, the developer's booking steps say the unit is registered with the DLD. Ask for your Oqood registration record and confirm it names project 4346 before the construction-linked payments begin.

Every Cycle

Track readings from the baseline

The first reading above 0% will be the first measured movement for The Meriva Collection. Meriva Sunset construction updates records each new reading against this February baseline.

General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at the 0% Baseline?

Entering before construction starts trades waiting time for the widest payment runway: the plan, the building and the handover date are fixed on paper while the plot itself is still at its baseline. Every payment goes to the DLD-registered escrow account for project 4346, released against recorded construction progress.

Entering at the 0% Baseline
  • 50% due within 360 days of booking, 20% across four construction milestones
  • 30% of the 70/30 plan due at completion
  • Handover expected Q2 2030, the full construction period still ahead
Typical Late Stage Entry
  • Structure largely standing before the buyer commits
  • Shorter wait to keys, less time for staged payments
  • Pricing usually reflects construction already completed
AED 3.06M ≈ USD 832KStarting Price
70/30 Plan30% Due on Completion
Q2 2030Expected Handover
Ask What Is Available at Meriva Sunset

7+ Units Available on the project page as of this update; availability shifts between cycles.

About the Development

Meriva Sunset Project Details

Sunset view of The Meriva Collection by Ellington showing illuminated facades, layered architecture and the central leisure deck in Dubai Presented by Tohid Fetrat
Dubai Islands · Ellington Properties

At the February 2026 reading, Meriva Sunset was a registered plan rather than a rising structure: 377 residences on a ground floor, 20 residential floors and a rooftop over a basement, part of 903 residences in The Meriva Collection. Starting prices: AED 3.06M ≈ USD 832K.

For buyers entering at this stage, the trade off is the longest wait and the full construction period against the widest payment runway, with 30% held back until handover, expected in Q2 2030.

Meriva Sunset by Ellington Properties Project Guide

Site Context This Cycle

Explore Meriva Sunset Location on Dubai Map

Meriva Sunset stands at the top of The Meriva Collection, the collection's highest viewpoint within a pedestrianised beachfront enclave on Island B, where waterways are planned to link the buildings to the shore. Because the February 2026 inspection found no construction activities started on the collection plot, this cycle records the site's position rather than any works on it.

Island B is reached by road, and the developer's own figures put Dubai Islands Mall 5 minutes away, Dubai International Airport and Dubai Festival City Mall 18 minutes, and Gold Souq Metro Station 20 minutes by car, which matters for buyers planning to rent or move in after the Q2 2030 handover. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Meriva Sunset at Dubai Islands on Dubai Map

Buyer Resources for This Project

Investing in Meriva Sunset at the Pre-Construction Stage

Before any works are recorded, residency planning and payment protection come ahead of site milestones. Each resource below is matched to where Meriva Sunset stood in February 2026.

Meriva Sunset by Ellington Properties in The Meriva Collection construction updates cover image featuring a project rendering of layered waterfront residential buildings, pools and landscaped grounds in Dubai - Presented by Tohid Fetrat
You Are Here

Meriva Sunset Construction Updates

This page: the 25 February 2026 DLD register baseline for Meriva Sunset, read at 0%.

Meriva Sunset by Ellington Properties in The Meriva Collection Golden Visa card graphic above residential buildings, landscaped grounds and pool amenities in Dubai - Presented by Tohid Fetrat

Meriva Sunset Golden Visa: Island B Residences Above the Line

Ellington Properties' Meriva Sunset, 377 residences in The Meriva Collection, sits above the threshold at all six tiers.

Read Meriva Sunset Golden Visa Guide
Meriva Sunset by Ellington Properties in The Meriva Collection escrow account protection concept with shield and padlock icons above a waterfront residential development with pools in Dubai - Presented by Tohid Fetrat

Meriva Sunset Escrow: Ellington's Island B Account at Sharjah Islamic Bank

Ellington's Meriva Sunset escrows 939 units with Sharjah Islamic Bank as DLD project 4346, certified 0% in February 2026.

Verify Meriva Sunset Escrow Account

Update Timeline

Other Meriva Sunset Construction Updates

February 2026 opens the inspection history for Meriva Sunset; each later reading joins the hub and is compared with this 0% baseline.

All Meriva Sunset Construction Updates

FAQs

Meriva Sunset Construction Progress in February 2026: Frequently Asked Questions

The DLD register reading dated 25 February 2026 is 0% for project 4346, registered as The Meriva Collection, the record that includes Meriva Sunset. It is the first reading on record for the project, so it sets the baseline that later readings will be compared with; no earlier figure or measured pace exists.

The inspection report dated 25 February 2026 states: "At time of inspection found: no construction activities have been started". It prints no percentage and shows its progress status as N/A, so the 0% figure on this page is the DLD register reading for project 4346, not a number taken from the report.

No. DLD project 4346 covers The Meriva Collection as a whole, and its 0% reading describes the entire registered scope rather than one building. That scope includes a basement-plus-ground-plus-20 high-rise residence, matching the developer's configuration for Meriva Sunset, alongside the other residences, a hotel and supporting amenities.

The DLD register lists the inspection on 25 February 2026, the construction start on 03 April 2026 and project registration on 14 April 2026, and it gives no reason for that sequence. This page prints each date exactly as recorded and treats the 25 February 2026 reading as the starting baseline for the record.

Nothing in the February 2026 record revises the developer's anticipated completion of Q2 2030, which remains the handover date used on this page. The DLD register separately shows a registered completion date of 31 December 2031 for project 4346. As plain arithmetic, not a forecast, 100 points remained over the 2,135 days from the 25 February 2026 reading to that registered date, about 1.41 points per 30-day month. How each later reading is tracked sits on the Meriva Sunset construction updates page.

By 29 September 2026 the 25 February 2026 reading was 216 days old, and it is the only reading this page draws on. Register figures can change after any inspection, so the live DLD record for project 4346 on Dubai REST is the place to confirm the current reading before relying on this one.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the February 2026 inspection record for Meriva Sunset correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts