Orise by Beyond recorded 8.61% construction progress at its 07 May 2026 RERA inspection, the first dated reading on this Dubai Maritime City foundation build.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

8.61%Construction Progress
07 May 2026Latest RERA Inspection
530 residential unitsTotal Units
Project 3425DLD Registration

Construction Snapshot

Orise by Beyond at Dubai Maritime City at a Glance

Orise by Beyond is a 530-residence twin tower address on plot 460 at Dubai Maritime City, registered with the Dubai Land Department on 04 December 2024 and started on site fourteen months before its first dated inspection. At 8.61% on 07 May 2026 the whole visible building is still ahead of the record, which makes the registration anchors below the only hard evidence a buyer has to work with at this depth in the programme.

DLD Project Number

3425

Project Status

Active

Construction Start

28 February 2025

Total Units

530 residential units

Total Built-Up Area

Registered Completion Date

30 November 2027 (DLD)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

Orise by Beyond at Dubai Maritime City Construction Update Timeline

This record opens with a single dated reading: 8.61% on 07 May 2026, taken while enabling works, piling, and foundation activity were the only packages running on plot 460. The register also holds an earlier 5.99% with no date beside it, so that figure stays off the track and out of the table below and is read here as ground covered rather than as a measured step. Every later inspection joins this row as it publishes.

Inspection MonthConstruction ProgressInspection DateFull Update
May 20268.61%07 May 2026View the May 2026 update

Pace Analysis

How Fast Orise by Beyond at Dubai Maritime City Has Been Built

With one dated inspection on the register, Orise cannot yet be read as a velocity between two site visits. What the record does support is a pace derived from the construction start and a pace implied by the delivery window:

  • 28 Feb 2025 start to the 07 May 2026 inspection, 0% to 8.61%About 0.6 points per month (derived)
  • Undated register figure to the May 2026 reading, 5.99% to 8.61%2.62 points, interval not published
  • 07 May 2026 to the close of the Q1 2028 handover window, 8.61% to 100%About 4.0 points per month (schedule-implied)

Those two figures are not a contradiction, and the gap between them is the single most useful thing on this page right now. Foundation work on reclaimed ground is the slowest percentage a tower ever earns: piling and pile caps consume programme without moving the certified number, which is why fourteen months of site activity converts to 0.6 points per month. The rate has to multiply roughly sevenfold once floor plates start repeating, and that is normal rather than alarming, because a 48-storey and a 28-storey frame add percentage in near-identical slices week after week. For a buyer on a calendar-dated payment plan, the practical test over the next few cycles is simple: the reading needs to leave the foundation band and start climbing in steps, and this page records whether it does.

Get the Next Inspection Figure First

Tell me you are tracking Orise by Beyond at Dubai Maritime City and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About Orise by Beyond at Dubai Maritime City at Maritime City

A percentage is only meaningful beside the thing it measures. What 530 buyers here are counting toward is set out in full on the project guide:

Orise by Beyond Developments in Dubai Maritime City aerial view of the twin residential towers along the Dubai Maritime City coastline with waterfront amenities in Dubai - Presented by Tohid Fetrat

Orise by Beyond at Dubai Maritime City, Paired Towers on One Podium

Orise by Beyond at Dubai Maritime City pairs 51 level and 32 level towers above a shared podium, holding 530 residences.

View the Orise by Beyond at Dubai Maritime City Project Guide

Considering an Early-Stage Entry?

Remaining developer inventory at Orise has narrowed considerably since launch, and what is left is defined by tower, level, and facing direction rather than by floor plan. Ask me what is still unsold before the podium rises above the hoarding line.

Ask About Remaining Availability on WhatsApp

Stage Record

Orise by Beyond at Dubai Maritime City Build Stages, Mapped to the Inspections

Every stage below carries the window it occupied in the Orise register rather than a textbook construction sequence. At 8.61% on 07 May 2026 that leaves one phase closed, one running, and three still entirely ahead of the certified record.

Dec 2024 to Feb 2025

Registration and Site Handover

Project 3425 entered the DLD register on 04 December 2024 under developer number 1875, with the trust account opened at Emirates NBD Bank before the 28 February 2025 start date.

Current PhaseFeb 2025 onward, 8.61% at last reading

Enabling Works, Piling, and Foundations

At the 07 May 2026 visit the certified packages on plot 460 were piling to the two tower cores and foundations beneath the shared podium, with enabling activity still running and the main contract carried as progressing. Nothing stood above ground level at that reading.

Next in the sequence

Shared Podium Structure

The registered description carries a common basement, ground level, and three parking podium floors, the deck that both towers grow from and the first stage visible from the coastal road.

Above podium level

Twin Tower Superstructure

Tower 1 climbs to 48 floors plus roof and Tower 2 to 28 floors plus roof, the phase where repeating floor plates convert programme time into certified percentage fastest.

Before the Q1 2028 window

Facade, Fit-Out, and Commissioning

Glazing, mechanical services, and interior finishing across 530 residences, followed by the commissioning and certification work that closes the final points before keys are released.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Orise by Beyond at Dubai Maritime City's own record.

Buyer Position

Tracking Your Position at Orise by Beyond at Dubai Maritime City

This page is one of four project resources that together cover a Orise by Beyond at Dubai Maritime City purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Orise by Beyond Developments in Dubai Maritime City construction updates cover image featuring a project rendering of the twin residential towers beside the waterfront and landscaped podium in Dubai - Presented by Tohid Fetrat
You Are Here

Orise by Beyond at Dubai Maritime City Construction Updates

This page: every certified reading for Orise by Beyond, gathered in one record through to handover.

Orise by Beyond Developments in Dubai Maritime City Golden Visa card graphic above a rendering of the twin residential towers at sunset in Dubai - Presented by Tohid Fetrat

Orise by Beyond at Dubai Maritime City Golden Visa, Chalets Included

From the 2 bedroom apartment upward, every tier at Orise by Beyond at Dubai Maritime City qualifies, chalets and penthouses included.

Read the Orise by Beyond at Dubai Maritime City Golden Visa Guide
Orise by Beyond Developments in Dubai Maritime City escrow account protection concept with shield and padlock icons above a penthouse terrace and Dubai skyline view in Dubai - Presented by Tohid Fetrat

Orise by Beyond at Dubai Maritime City: The Escrow on Record

Orise by Beyond at Dubai Maritime City registers 530 units as DLD project 3425, Emirates NBD escrow, 8.61% certified May 2026.

Verify the Orise by Beyond at Dubai Maritime City Escrow Account

Approaching Handover

Between 8.61% and Handover: What Orise by Beyond at Dubai Maritime City Buyers Should Do Now

At foundation stage almost everything a buyer has paid for is destined to be buried, so the work that matters now is verification rather than inspection. The Orise instalment schedule is anchored to fixed dates rather than to certified milestones, so a payment arrives on its date whether or not the percentage has moved since the previous cycle, and the three checks below belong ahead of the next one.

First, confirm where your money lands: the Orise by Beyond escrow account page sets out the DLD-registered trust account for project 3425 and how a developer is permitted to draw against certified progress.

Second, follow the record cycle by cycle rather than at handover; the May 2026 inspection report for Orise sets the baseline this page measures every later reading against.

Third, if residency is part of why you bought, settle eligibility early through the Orise by Beyond Golden Visa page, because the application path depends on registration and title deed timing rather than on the construction percentage.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore Maritime City Structure

No project is judged on its own inspection sheet alone. These three pages set the Orise foundation reading against the peninsula holding it, the listings competing with it, and the developer signing its certificates:

Dubai Maritime City Properties for Sale featuring modern waterfront towers elegant architecture and premium coastal living in Dubai Presented by Tohid Fetrat

Dubai Maritime City: Waterfront Apartments and Branded Residences on the Northern Coastline

Dubai Maritime City lists 7 projects of waterfront apartments and branded residences in DP World's district, freehold for all nationalities.

See Maritime City Properties for Sale
Dubai Maritime City aerial masterplan showing waterfront residential towers, marina docks and mixed-use coastal district along the Gulf – Presented by Tohid Fetrat

Maritime City Community Overview

Read the Dubai Maritime City guide: a waterfront district between Port Rashid and Dubai Drydocks with high-rise coastal living.

Explore the Maritime City Community
Beyond Developments Dubai developer showcase featuring luxury waterfront residences, contemporary architecture and premium coastal living environment in Dubai. Presented by Tohid Fetrat

Beyond Developments: Omniyat's Design DNA on the Dubai Maritime City Waterfront

Beyond brings Omniyat's design DNA to waterfront communities in Dubai Maritime City and Palm Jumeirah, with every project along the coast.

View the Beyond Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

Orise by Beyond at Dubai Maritime City Construction Updates Frequently Asked Questions

Orise by Beyond carries an Active status on the DLD register under project number 3425 and sits in its foundation phase, recorded at 8.61% at the inspection of 07 May 2026. Every reading is listed in the inspection timeline above.

The 07 May 2026 inspection put Orise by Beyond at 8.61%, which is 2.62 points above the 5.99% the register holds with no inspection date beside it, and the inspector logged piling and foundation work underway on plot 460. The full report sits in the May 2026 construction update.

Q1 2028 is the expected handover window for Orise by Beyond, while the completion date held on the DLD register for project 3425 reads 30 November 2027. A registered date is set administratively when a project is entered on the register, not by site progress; with 8.61% certified on 07 May 2026, 91.39 percentage points remain, and this page records each new reading as it publishes.

Orise by Beyond holds 530 residential units across two towers sharing one podium: Tower 1 rises to 48 floors above roof level and Tower 2 to 28 floors, over a common basement, ground level, and three parking floors. Layouts run from one-bedroom apartments through chalets and Signature Collection duplexes to four-bedroom penthouses.

Construction officially started on 28 February 2025, following DLD registration on 04 December 2024. The first dated inspection came fourteen months later, on 07 May 2026, and recorded 8.61% progress.

At the 07 May 2026 reading everything certified at Orise sits below finished floor level: piling to the two tower cores, foundation work under the shared podium, and enabling activity across plot 460, with the RERA main-contract status carried as progressing. Neither the podium nor either tower frame had started, which is why the figure stands at 8.61%.

Measured from the 28 February 2025 start to the 07 May 2026 reading of 8.61%, the derived pace is about 0.6 percentage points per month, the slow rate typical of piling and foundation work on reclaimed ground. Reaching 100% by the close of the Q1 2028 handover window implies about 4.0 points per month from that reading onward. The full working sits in the pace analysis above.

Yes. The two towers occupy plot 460 in Madinat Dubai Almelaheyah, on the open water edge of the reclaimed Dubai Maritime City peninsula, within the Beyond Developments masterplan. Orientation, tower split, and outlook are covered in the Orise by Beyond project guide.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the Orise by Beyond at Dubai Maritime City construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

WhatsApp +971543443597
Get the Latest Status