March 2026 DLD Register Reading Places Safa One at 58.83% Construction Progress in Safa Park
Superstructure and internal works were at advanced stages when Safa One was inspected on 24 March 2026, while MEP, envelope and finishes progressed across both towers.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Safa One Construction Snapshot
A 16.77 point rise over the app's previous inspection figure put Safa One in the envelope and MEP band on 24 March 2026, the mid-construction stage where each register reading shapes how buyers pace their remaining instalments.
Safa One de GRISOGONO by DAMAC
2374
Active
58.83%
24 March 2026
1 June 2022
511 residential units
70,342.70 sq m
30 December 2025
Data source: the Dubai Land Department project register reading dated 24 March 2026, the day of the RERA inspection, whose report records the stage notes and prints no percentage. Safa One is registered on the DLD project register as DAMAC CITY, project 2374. The registered completion date of 30 December 2025 had lapsed 84 days before this inspection; the handover quoted for buyers is Q4 2026. This reading was 189 days old when the page was prepared on 29 September 2026, and later readings exist, so re-check project 2374 on Dubai REST for the current figure. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: March 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Safa One Construction Progress Summary
On 24 March 2026 the Dubai Land Department project register recorded Safa One at 58.83%, while the app's previous inspection figure of 42.06% carries no date, so the 16.77 point gap gives no monthly pace. Measured from the 1 June 2022 construction start, the reading averaged about 1.27 points a month over 1,392 days: derived arithmetic on a 30-day month, not a forecast.
- Enabling works, recorded as substantially completed
- Foundation works, recorded as substantially completed
- Superstructure of Tower A (G + 4P + 57) and Tower B (G + 4P + 40), at advanced stages
- Internal works, at advanced stages
- MEP, envelope and finishes, each progressing at a different stage
- Site mobilization, recorded as ongoing
- Further register readings toward 100%
- Completing envelope, MEP and finishes across the 511 residences
- Owner handover scheduled for Q4 2026
Payment Linked Progress
What 58.83% Progress Meant for Safa One Buyers
Safa One's current plan is 20% on booking, 40% during construction and 40% on completion, so at the 58.83% reading of March 2026 the 40% due on completion was still ahead, while the 40% construction share is paid as your own sale and purchase agreement schedules it. With the superstructure well advanced but envelope, MEP and finishes still open, four actions mattered at this stage.
Verify the escrow account
Every payment still due before handover should go only to the DLD regulated escrow account registered for project 2374. Safa One escrow account verification comes before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA milestone schedule
Check how your sale and purchase agreement schedules the 40% payable during construction and the 40% due on completion, then read those clauses against the 58.83% reading and the Q4 2026 handover. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Plan the snagging inspection
In March 2026, with envelope, MEP and finishes still progressing, units were not yet ready for a handover inspection, but duplex homes with private pools and double-height terraces take longer to check than a standard apartment. The Safa One snagging inspection guide sets out when to book before you accept a unit.
Track the remaining readings
Each dated register reading after this one shows whether envelope and MEP works are closing the gap to Q4 2026. The Safa One construction updates hub holds the full reading history in order.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 58.83%?
Entering at the stage recorded in March 2026 meant buying into twin towers whose superstructure was well advanced while the facade, services and interiors were still being completed, with a longer runway to handover than a near-finished building offers. Every payment goes to the DLD-registered escrow account for project 2374, released against construction progress recorded by the Dubai Land Department.
- Superstructure and internal works recorded at advanced stages on 24 March 2026
- Owner handover scheduled for Q4 2026
- 40% of the current 60/40 plan still due on completion
- Every construction stage still ahead, from excavation onward
- Delivery usually several years away at the point of purchase
- Longest instalment runway, priced at launch levels
Unit availability is not part of this inspection record; it shifts between cycles and is confirmed at the time of your enquiry.
About the Development
Safa One Project Details

At the March 2026 inspection Safa One was a mid-construction pair of towers, 57 and 40 levels above a four-level podium, holding 511 residences from 1 bedroom apartments to 5 bedroom penthouses. Starting prices on the current list: AED 2.40M (approx. USD 653K).
For buyers entering at that reading, the trade off was a longer wait for keys against more of the build still ahead, with the final 40% of the current plan payable on completion and owner handover set for Q4 2026.
Safa One de GRISOGONO Project GuideSite Context This Cycle
Explore Safa One Location on Dubai Map
Safa One rises beside Safa Park on Sheikh Zayed Road as two towers over a four-level podium, Tower A reaching 57 floors above it and Tower B 40, and the floor-plan brochure orients the upper duplex levels toward Dubai Canal, The World Islands and Safa Park views; at the March 2026 inspection the envelope that frames those outlooks was still progressing.
The developer brochure calls Safa Park one of the city's oldest parks and places Burj Khalifa 7 minutes and Dubai International Airport 14 minutes away, so buyers at this stage were weighing an established district against a building whose services and interiors were still under way. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Safa One During Mid-Construction Progress
The envelope and MEP band is where escrow checks, residency planning, and early snagging preparation begin to overlap. Each resource below is matched to where Safa One stood in March 2026.

Safa One Construction Updates
This page: the 24 March 2026 register reading for Safa One and its recorded works.

Safa One de GRISOGONO Golden Visa: Jeweller-Branded, Every Tier
DAMAC's Safa One de GRISOGONO, a pair of towers holding 511 units at Safa Park, qualifies at all five tiers.
Read Safa One Golden Visa Guide
Safa One de GRISOGONO Escrow: DAMAC's Safa Park Account
DAMAC's Safa One de GRISOGONO escrows 511 units at Emirates NBD as DLD project 2374, 68.66% certified July 2026.
Verify Safa One Escrow Account
Safa One de GRISOGONO Snagging for the Twin Towers at Safa Park
Safa One de GRISOGONO is DAMAC Properties' freehold twin-tower development on Sheikh Zayed Road, with 511 residential units.
Book Safa One SnaggingUpdate Timeline
Other Safa One Construction Updates
The March 2026 reading opens the dated Safa One record on this site; the inspection that followed it is covered in the July 2026 update.
Where This Update Fits
Explore Safa One Structure
This monthly record sits inside a wider picture: the park-side community around the towers, the developer behind them, and the listings that compete with them.

Safa Park Properties for Sale
Browse luxury apartments, branded residences and penthouses for sale around Safa Park.
See Safa Park Properties for Sale
Safa Park Community Overview
Read the Safa Park guide: established villas and canal-front residences beside one of Dubai's oldest public parks.
Explore the Safa Park Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileFAQs
Safa One Construction Progress in March 2026: Frequently Asked Questions
The Dubai Land Department project register recorded Safa One at 58.83% on 24 March 2026, the date of that cycle's RERA inspection. The same register entry lists 42.06% as the previous inspection figure, 16.77 points lower, but gives that earlier figure no date. The March reading was 189 days old on 29 September 2026 and a later inspection followed on 15 July 2026, so 58.83% describes that inspection day only.
The DLD record for project 2374 listed 30 December 2025 as the registered completion date, and by the 24 March 2026 inspection that date had passed 84 days earlier with Safa One at 58.83%. The handover date quoted for buyers is Q4 2026. The supplied record shows no amended registered date, so check project 2374 on Dubai REST and read the completion and delay clauses of your SPA, which define your position if completion moves.
At 58.83% on 24 March 2026, Safa One sat in the mid-construction band: the inspection notes record enabling and foundation works as substantially completed and the superstructure at advanced stages, while envelope, MEP and finishes, the trades that turn a frame into habitable homes, were still progressing. 41.17 points separated the reading from 100%. From the 1 June 2022 construction start, progress averaged about 1.27 points a month, derived arithmetic on a 30-day month and not a forecast.
The RERA report describes two towers, Tower A at ground plus four podium levels plus 57 floors and Tower B at ground plus four podium levels plus 40, designed as a concrete structure with blockwork and internal and external finishes. Its photographs from the 24 March 2026 visit showed both towers with glazed facade sections and facade works under scaffold, and a fitted apartment interior with a marble feature wall and an open kitchen. Site mobilization was still recorded as ongoing on the same visit.
The Dubai REST app shows 42.06% as the previous inspection on the 24 March 2026 entry for project 2374 but attaches no date to it, so the 16.77 point gap to 58.83% cannot be spread over a known number of days. That is why this page shows it as a single undated dot on the progress track and draws no monthly rate from it. The first dated pair in the record runs from 24 March 2026 to 15 July 2026 and is measured in the Safa One July 2026 construction update.
The figure is a Dubai Land Department project register reading, shown in the Dubai REST app for project 2374, which is registered under the name DAMAC CITY. The RERA Independent Progress Monitoring Report from the 24 March 2026 visit carries the inspection notes and a progressing status for the main contract but prints no percentage. How the register and the inspection reports fit together across every cycle is covered on the Safa One construction updates hub.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the March 2026 inspection record for Safa One de GRISOGONO correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.