Safa One de GRISOGONO Construction Update - March 2026

March 2026 DLD Register Reading Places Safa One at 58.83% Construction Progress in Safa Park

Superstructure and internal works were at advanced stages when Safa One was inspected on 24 March 2026, while MEP, envelope and finishes progressed across both towers.

Direct advisor access. Every message answered personally, never by a call center.

58.83%DLD Register Reading
24 March 2026Inspection Date
Q4 2026Expected Handover
2374DLD Project Number

Verified DLD Inspection Data

Safa One Construction Snapshot

A 16.77 point rise over the app's previous inspection figure put Safa One in the envelope and MEP band on 24 March 2026, the mid-construction stage where each register reading shapes how buyers pace their remaining instalments.

Project Name

Safa One de GRISOGONO by DAMAC

Project Number

2374

Project Status

Active

Construction Progress

58.83%

Inspection Date

24 March 2026

Construction Start

1 June 2022

Total Units

511 residential units

Total Built Area

70,342.70 sq m

Expected Completion

30 December 2025

Data source: the Dubai Land Department project register reading dated 24 March 2026, the day of the RERA inspection, whose report records the stage notes and prints no percentage. Safa One is registered on the DLD project register as DAMAC CITY, project 2374. The registered completion date of 30 December 2025 had lapsed 84 days before this inspection; the handover quoted for buyers is Q4 2026. This reading was 189 days old when the page was prepared on 29 September 2026, and later readings exist, so re-check project 2374 on Dubai REST for the current figure. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: March 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

Safa One Construction Progress Summary

On 24 March 2026 the Dubai Land Department project register recorded Safa One at 58.83%, while the app's previous inspection figure of 42.06% carries no date, so the 16.77 point gap gives no monthly pace. Measured from the 1 June 2022 construction start, the reading averaged about 1.27 points a month over 1,392 days: derived arithmetic on a 30-day month, not a forecast.

Completed
  • Enabling works, recorded as substantially completed
  • Foundation works, recorded as substantially completed
In Progress at 58.83%
  • Superstructure of Tower A (G + 4P + 57) and Tower B (G + 4P + 40), at advanced stages
  • Internal works, at advanced stages
  • MEP, envelope and finishes, each progressing at a different stage
  • Site mobilization, recorded as ongoing
Ahead of Handover
  • Further register readings toward 100%
  • Completing envelope, MEP and finishes across the 511 residences
  • Owner handover scheduled for Q4 2026
Next inspectionThe next dated register reading in the record is 15 July 2026, covered in the July 2026 update.
Completion targetOwner handover Q4 2026. The registered completion date on the DLD record, 30 December 2025, had lapsed 84 days before this inspection.
Remaining distance41.17 percentage points separated the 24 March 2026 reading from 100%.

Payment Linked Progress

What 58.83% Progress Meant for Safa One Buyers

Safa One's current plan is 20% on booking, 40% during construction and 40% on completion, so at the 58.83% reading of March 2026 the 40% due on completion was still ahead, while the 40% construction share is paid as your own sale and purchase agreement schedules it. With the superstructure well advanced but envelope, MEP and finishes still open, four actions mattered at this stage.

Before Any Further Instalment

Verify the escrow account

Every payment still due before handover should go only to the DLD regulated escrow account registered for project 2374. Safa One escrow account verification comes before any transfer; the lookup itself takes about two minutes against the official DLD project record.

Before the Next Milestone

Reread your SPA milestone schedule

Check how your sale and purchase agreement schedules the 40% payable during construction and the 40% due on completion, then read those clauses against the 58.83% reading and the Q4 2026 handover. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.

Plan Ahead of Q4 2026

Plan the snagging inspection

In March 2026, with envelope, MEP and finishes still progressing, units were not yet ready for a handover inspection, but duplex homes with private pools and double-height terraces take longer to check than a standard apartment. The Safa One snagging inspection guide sets out when to book before you accept a unit.

Every Cycle

Track the remaining readings

Each dated register reading after this one shows whether envelope and MEP works are closing the gap to Q4 2026. The Safa One construction updates hub holds the full reading history in order.

General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 58.83%?

Entering at the stage recorded in March 2026 meant buying into twin towers whose superstructure was well advanced while the facade, services and interiors were still being completed, with a longer runway to handover than a near-finished building offers. Every payment goes to the DLD-registered escrow account for project 2374, released against construction progress recorded by the Dubai Land Department.

Entering at 58.83%
  • Superstructure and internal works recorded at advanced stages on 24 March 2026
  • Owner handover scheduled for Q4 2026
  • 40% of the current 60/40 plan still due on completion
Typical Launch Entry
  • Every construction stage still ahead, from excavation onward
  • Delivery usually several years away at the point of purchase
  • Longest instalment runway, priced at launch levels
AED 2.40M (approx. USD 653K)Starting Price
60/40 Plan40% Due on Completion
Q4 2026Expected Handover
Ask What Is Available at Safa One

Unit availability is not part of this inspection record; it shifts between cycles and is confirmed at the time of your enquiry.

About the Development

Safa One Project Details

Safa One by DAMAC in Safa Park luxury residential towers overlooking Sheikh Zayed Road during daytime in Dubai - Presented by Tohid Fetrat
Safa Park · DAMAC

At the March 2026 inspection Safa One was a mid-construction pair of towers, 57 and 40 levels above a four-level podium, holding 511 residences from 1 bedroom apartments to 5 bedroom penthouses. Starting prices on the current list: AED 2.40M (approx. USD 653K).

For buyers entering at that reading, the trade off was a longer wait for keys against more of the build still ahead, with the final 40% of the current plan payable on completion and owner handover set for Q4 2026.

Safa One de GRISOGONO Project Guide

Site Context This Cycle

Explore Safa One Location on Dubai Map

Safa One rises beside Safa Park on Sheikh Zayed Road as two towers over a four-level podium, Tower A reaching 57 floors above it and Tower B 40, and the floor-plan brochure orients the upper duplex levels toward Dubai Canal, The World Islands and Safa Park views; at the March 2026 inspection the envelope that frames those outlooks was still progressing.

The developer brochure calls Safa Park one of the city's oldest parks and places Burj Khalifa 7 minutes and Dubai International Airport 14 minutes away, so buyers at this stage were weighing an established district against a building whose services and interiors were still under way. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Safa One de GRISOGONO by DAMAC on Dubai Map

Buyer Resources for This Project

Investing in Safa One During Mid-Construction Progress

The envelope and MEP band is where escrow checks, residency planning, and early snagging preparation begin to overlap. Each resource below is matched to where Safa One stood in March 2026.

Safa One de GRISOGONO Construction Updates showing the illuminated twin tower exterior along Sheikh Zayed Road in Dubai Presented by Tohid Fetrat
You Are Here

Safa One Construction Updates

This page: the 24 March 2026 register reading for Safa One and its recorded works.

Safa One de GRISOGONO Golden Visa illustration featuring the development with a UAE Golden Visa card in Dubai Presented by Tohid Fetrat

Safa One de GRISOGONO Golden Visa: Jeweller-Branded, Every Tier

DAMAC's Safa One de GRISOGONO, a pair of towers holding 511 units at Safa Park, qualifies at all five tiers.

Read Safa One Golden Visa Guide
Safa One de GRISOGONO Escrow Account illustration featuring the development with security lock and shield symbols in Dubai Presented by Tohid Fetrat

Safa One de GRISOGONO Escrow: DAMAC's Safa Park Account

DAMAC's Safa One de GRISOGONO escrows 511 units at Emirates NBD as DLD project 2374, 68.66% certified July 2026.

Verify Safa One Escrow Account
Safa One de GRISOGONO by DAMAC Properties in Safa Park snagging inspection cover image featuring a luxury bedroom interior with full height glazing overlooking the coastline in Dubai - Presented by Tohid Fetrat

Safa One de GRISOGONO Snagging for the Twin Towers at Safa Park

Safa One de GRISOGONO is DAMAC Properties' freehold twin-tower development on Sheikh Zayed Road, with 511 residential units.

Book Safa One Snagging

Update Timeline

Other Safa One Construction Updates

The March 2026 reading opens the dated Safa One record on this site; the inspection that followed it is covered in the July 2026 update.

All Safa One Construction Updates

FAQs

Safa One Construction Progress in March 2026: Frequently Asked Questions

The Dubai Land Department project register recorded Safa One at 58.83% on 24 March 2026, the date of that cycle's RERA inspection. The same register entry lists 42.06% as the previous inspection figure, 16.77 points lower, but gives that earlier figure no date. The March reading was 189 days old on 29 September 2026 and a later inspection followed on 15 July 2026, so 58.83% describes that inspection day only.

The DLD record for project 2374 listed 30 December 2025 as the registered completion date, and by the 24 March 2026 inspection that date had passed 84 days earlier with Safa One at 58.83%. The handover date quoted for buyers is Q4 2026. The supplied record shows no amended registered date, so check project 2374 on Dubai REST and read the completion and delay clauses of your SPA, which define your position if completion moves.

At 58.83% on 24 March 2026, Safa One sat in the mid-construction band: the inspection notes record enabling and foundation works as substantially completed and the superstructure at advanced stages, while envelope, MEP and finishes, the trades that turn a frame into habitable homes, were still progressing. 41.17 points separated the reading from 100%. From the 1 June 2022 construction start, progress averaged about 1.27 points a month, derived arithmetic on a 30-day month and not a forecast.

The RERA report describes two towers, Tower A at ground plus four podium levels plus 57 floors and Tower B at ground plus four podium levels plus 40, designed as a concrete structure with blockwork and internal and external finishes. Its photographs from the 24 March 2026 visit showed both towers with glazed facade sections and facade works under scaffold, and a fitted apartment interior with a marble feature wall and an open kitchen. Site mobilization was still recorded as ongoing on the same visit.

The Dubai REST app shows 42.06% as the previous inspection on the 24 March 2026 entry for project 2374 but attaches no date to it, so the 16.77 point gap to 58.83% cannot be spread over a known number of days. That is why this page shows it as a single undated dot on the progress track and draws no monthly rate from it. The first dated pair in the record runs from 24 March 2026 to 15 July 2026 and is measured in the Safa One July 2026 construction update.

The figure is a Dubai Land Department project register reading, shown in the Dubai REST app for project 2374, which is registered under the name DAMAC CITY. The RERA Independent Progress Monitoring Report from the 24 March 2026 visit carries the inspection notes and a progressing status for the main contract but prints no percentage. How the register and the inspection reports fit together across every cycle is covered on the Safa One construction updates hub.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the March 2026 inspection record for Safa One de GRISOGONO correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts