Six Senses Residences The Palm beachfront residential buildings with landscaped pools, private beach, and Dubai skyline, construction updates. Presented by Tohid Fetrat

Select Group · Palm Jumeirah · Construction Update

Six Senses Residences The Palm Construction Update - May 2026

May 2026 Inspection Records Six Senses Residences The Palm at 97.86% Construction Progress on Palm Jumeirah

Hotel building envelope, MEP, interior finishes, and external works were still progressing at Six Senses Residences The Palm when the 05 May 2026 inspection recorded 97.86 percent.

Direct advisor access. Every message answered personally, never by a call center.

97.86%Construction Progress
05 May 2026Inspection Date
Q3 2026Expected Completion
2350DLD Project Number

Verified DLD Inspection Data

Six Senses Residences The Palm Construction Snapshot

A 0.28 point rise over the previous inspection reading of 97.58% places Six Senses Residences The Palm in the handover preparation band, with a Building Completion Certificate already on record from 14 January 2026 and the hotel building carrying the open site work.

Project Name

Six Senses Residences The Palm, Dubai

Project Number

2350

Project Status

Finished

Construction Progress

97.86%

Inspection Date

05 May 2026

Construction Start

05 January 2022

Total Units

162 Luxury Residences

Total Built Area

112,361.27 sq m

Expected Completion

Q3 2026

Data source: RERA Independent Progress Monitoring Report for the inspection conducted on 05 May 2026, tracked against DLD inspection records for project 2350 (registered 04 February 2022); Q3 2026 is the scheduled handover. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. This page records the May 2026 reading; a later September 2026 inspection has since been published. Last updated: September 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

Six Senses Residences The Palm Construction Progress Summary

The 05 May 2026 inspection moved Six Senses Residences The Palm from a previous reading of 97.58% to 97.86%, a 0.28 point gain; the DLD app shows that earlier reading without a date, so no monthly pace can be measured from this pair. The inspection notes describe building construction as substantially complete, with the remaining packages concentrated at the hotel building.

Completed
  • Building construction activities substantially completed, per the May 2026 notes
  • DCD issued 05 November 2025 and LPG issued 11 December 2025
  • Building Completion Certificate issued 14 January 2026
  • All DEWA water and electrical meters installed; cooling connected by Empower
In Progress at 97.86%
  • External envelope works at the hotel building
  • MEP works at the hotel building
  • Internal finishes at the hotel building
  • External works at the hotel building
Ahead of Handover
  • Remaining RERA inspection cycles toward 100%
  • Close out of the hotel building packages listed as progressing
  • Unit handovers scheduled for Q3 2026, confirmed per unit with Select Group
Next inspectionPublished in the DLD project register after the next RERA site visit; the September 2026 update on this cluster carries the following reading.
Completion targetHandover scheduled for Q3 2026; the DLD register still shows a registered completion date of 31 December 2024, which had already lapsed by this inspection.
Remaining distance2.14 percentage points separated the 05 May 2026 reading from 100%.

Payment Linked Progress

What 97.86% Progress Means for Six Senses Residences The Palm Buyers

Under the 50/50 plan of record published at launch, half of the price falls due on completion, so a 97.86% reading with a Building Completion Certificate already issued points buyers toward the completion balance, the handover notice, and unit acceptance. At this stage of Six Senses Residences The Palm, four actions matter most.

Before the Completion Payment

Verify the escrow account

The completion balance should go only to the DLD regulated escrow account registered for project 2350, never to a personal or agency account. Six Senses Residences The Palm escrow account verification sets out the check; the lookup itself takes about two minutes against the official DLD project record.

Before the Handover Notice

Reread your SPA handover clauses

Check how your sale and purchase agreement defines the completion installment, the handover notice period, and the conditions for key release, then map those clauses against the Q3 2026 handover. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the certified milestones.

Window Open Now

Book the snagging inspection

At 97.86% and within months of the Q3 2026 handover, penthouses, sky villa duplexes, and beachfront villas all sit inside the booking window for a pre handover inspection. Six Senses Residences The Palm snagging inspection guide covers pool, terrace, and finish checks before acceptance.

Every Cycle

Track the final reading

The May 2026 notes place the outstanding 2.14 points of work at the hotel building rather than the residential blocks. Six Senses Residences The Palm construction updates gathers every published reading in one record.

General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 97.86%?

Entering at this stage means buying into a finished structure rather than a construction timeline: the completion certificate is already on record and the remaining decision is between the residences still offered. Every payment goes to the DLD-registered escrow account for project 2350, released against certified construction progress.

Entering Now at 97.86%
  • Building Completion Certificate issued 14 January 2026, before this reading
  • Handover scheduled for Q3 2026, months rather than years away
  • Launch plan of record put 50% on completion; current terms come from Select Group
Typical Launch Entry
  • Construction risk carried from the first excavation to handover
  • Delivery horizons at launch commonly run to several years
  • More installment runway, at the price set on launch day
AED 13.65M ≈ USD 3.72MStarting Price
50/50 Launch Plan50% Due on Completion
Q3 2026Expected Handover
Ask What Is Available at Six Senses Residences The Palm

Limited units available per the project page as of this update; availability shifts between cycles.

About the Development

Six Senses Residences The Palm Project Details

Six Senses Residences The Palm by Select Group residential building exterior with contemporary architecture in Dubai - Presented by Tohid Fetrat
Palm Jumeirah · Select Group

With building construction substantially complete and only hotel building packages open at the May 2026 inspection, Six Senses Residences The Palm is a collection of 162 luxury residences, from penthouses to sky villa duplexes and beachfront villas, on the West Crescent. Starting prices: AED 13.65M ≈ USD 3.72M.

For buyers entering this late, the trade off is little payment plan runway against a finished building and a Q3 2026 handover, with each unit's exact date confirmed by Select Group.

Six Senses Residences The Palm Project Guide

Site Context This Cycle

Explore Six Senses Residences The Palm Location on Dubai Map

Six Senses Residences The Palm occupies plot 2023 on the West Crescent of Palm Jumeirah, a shoreline site with direct beach access, private marine access, and sea, city skyline, and Palm views listed in the developer fact sheet. On a plot this exposed, envelope and external packages are the most weather facing works, and at the hotel building both were still listed as progressing in the May 2026 inspection notes.

Palm Jumeirah is an established island community, with Dubai Marina, JBR, and the ferry terminal named as nearby points of interest in the fact sheet, so the development is finishing into mature surroundings rather than an emerging district. Inside the gated site, DEWA meters were installed and Empower district cooling connected by this inspection, which matters for buyers planning occupancy or rental soon after the Q3 2026 handover. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Six Senses Residences The Palm on Dubai Map

Buyer Resources for This Project

Investing in Six Senses Residences The Palm Ahead of Handover

At the handover preparation stage, escrow checks on the completion balance, residency planning, and defect documentation all come due together. Each resource below is matched to where Six Senses Residences The Palm stood in May 2026.

Six Senses Residences The Palm beachfront residential buildings with landscaped pools, private beach, and Dubai skyline, construction updates. Presented by Tohid Fetrat
You Are Here

Six Senses Residences The Palm Construction Updates

This page: the 05 May 2026 inspection record for Six Senses Residences The Palm at 97.86%.

Six Senses Residences The Palm with a United Arab Emirates Golden Visa card representing potential long term residency opportunities through qualifying property investment Presented by Tohid Fetrat

Six Senses Residences The Palm Golden Visa: Five Residence Types

Select Group's Six Senses Residences The Palm, 162 branded residences on the West Crescent, qualifies at all five types.

Read Six Senses Residences The Palm Golden Visa Guide
Six Senses Residences The Palm entrance with escrow account security icons representing protected buyer funds during property development Presented by Tohid Fetrat

Six Senses Residences The Palm: Select Group's Escrow at 100%

Select Group's Six Senses Residences The Palm, DLD project 2350, read 100% certified September 2026, 173 units escrowed at Emirates NBD.

Verify Six Senses Residences The Palm Escrow Account
Luxury villa at Six Senses Residences The Palm highlighting the importance of a professional snagging inspection before handover Presented by Tohid Fetrat

Six Senses Residences The Palm Snagging: Penthouses, Sky Villas and Beachfront Villas

Six Senses Residences The Palm is Select Group's collection of 162 branded residences on the West Crescent of Palm Jumeirah.

Book Six Senses Residences The Palm Snagging

Update Timeline

Other Six Senses Residences The Palm Construction Updates

May 2026 is the first monthly report published for Six Senses Residences The Palm on this cluster; the following reading is covered in the September 2026 update, and the full record sits on the construction updates hub.

All Six Senses Residences The Palm Construction Updates

FAQs

Six Senses Residences The Palm Construction Progress in May 2026: Frequently Asked Questions

As of the RERA inspection conducted on 05 May 2026, Six Senses Residences The Palm stands at 97.86% construction progress in the DLD project register for project 2350, 0.28 points above the previous inspection reading of 97.58%, which the register view lists without a date.

Handover is scheduled for Q3 2026, and the 05 May 2026 reading left 2.14 percentage points to 100%, with the Building Completion Certificate already issued on 14 January 2026. The DLD register separately carries a registered completion date of 31 December 2024, which had lapsed before this inspection; register dates can be revised between cycles, and each buyer confirms the handover date for their own unit with Select Group. How the full inspection record reads over time is covered on Six Senses Residences The Palm construction updates.

The May 2026 inspection notes describe building construction activities as substantially completed, with the external envelope, MEP, internal finishes, and external works still progressing at the hotel building; no other building is listed with open works. The registered project description covers a hotel and penthouse building of basement, ground, ten floors and roof, a second penthouse building of the same height, two sky villa towers of basement, ground, seven floors and roof, nine signature villas, a restaurant, and changing rooms.

The Building Completion Certificate is dated 14 January 2026, while the RERA reading of 05 May 2026 still weighted packages the inspection notes list as progressing at the hotel building: external envelope, MEP, internal finishes, and external works. The two records stand side by side as issued, and neither changes the date of the other.

By 05 May 2026 the inspection notes record three issued approvals: the DCD (Dubai Civil Defence) approval on 05 November 2025, the LPG (gas installation) approval on 11 December 2025, and the Building Completion Certificate on 14 January 2026. All DEWA water and electrical meters were also recorded as installed at that inspection.

The May 2026 inspection notes record air conditioning as installed and connected by Empower (Emirates Central Cooling), a district cooling provider. District cooling in Dubai is usually billed separately from DEWA electricity and water, with charges and any connection terms set by the provider and the building management, so the arrangement for each unit is worth confirming before handover.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the May 2026 inspection record for Six Senses Residences The Palm correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts