The Edge Construction Update - June 2025

June 2025 Inspection Confirms The Edge Reaches 42.01% Construction Progress in Business Bay

June 2025 inspection confirms The Edge construction progress reached 42.01%, with structural and façade works advancing across Select Group’s twin tower development in Business Bay.

The Edge Construction Snapshot

Minimal black line icon representing project name with building symbol in modern UI design Presented by Tohid Fetrat

Project Name

The Edge by Select Group

Minimal black line icon showing grid with hash symbol representing project number Presented by Tohid Fetrat

Project Number

2611

Minimal black line icon showing checklist with check marks and approval badge representing project status Presented by Tohid Fetrat

Project Status

Active

Minimal black line icon showing construction crane with rising bar chart representing construction progress Presented by Tohid Fetrat

Construction Progress

42.01%

Minimal black line icon showing calendar with check mark representing inspection date Presented by Tohid Fetrat

Inspection Date

11 June 2025

Minimal black line icon showing construction crane with check mark representing construction start Presented by Tohid Fetrat

Construction Start

09 June 2023

Minimal black line icon showing unit grid with question mark representing total units Presented by Tohid Fetrat

Total Units

1,030 residential units

Minimal black line icon showing building surrounded by measuring tape representing total built area Presented by Tohid Fetrat

Total Built Area

65,564.27 sq m

Minimal black line icon showing calendar with clock representing expected completion time Presented by Tohid Fetrat

Expected Completion

11 October 2026

The Edge Construction Progress Summary

The latest inspection conducted on 11 June 2025 confirms The Edge has advanced from 25.59% to 42.01% construction progress as structural, superstructure, and façade activity continue progressing across the Business Bay waterfront development.

Current inspection findings confirm completed enabling, foundation, and substructure works while superstructure construction, internal works, MEP systems, and internal finishes continue progressing across Select Group’s twin residential tower development near Dubai Canal.

The Edge Structural Construction Update

The June 2025 inspection report confirms structural and superstructure construction works remain actively progressing at The Edge, with visible tower development activity continuing across the Business Bay waterfront site.

Inspection findings confirm completed enabling, foundation, and substructure works while superstructure operations, internal works, MEP systems, and internal finishing activity continue progressing across multiple residential tower levels within Select Group’s canal-front development.

Explore The Edge Location on Dubai Map

The Edge is positioned within Business Bay near Dubai Canal, a central Dubai district designed around waterfront residential living, premium business connectivity, and skyline facing urban environments.

The location connects residents toward Downtown Dubai, DIFC, Sheikh Zayed Road, and Dubai International Airport through one of Dubai’s most established mixed use waterfront communities.

Map Preview
Click to view Dubai interactive map

Investing in The Edge During Active Construction Progress

The transition into enabling works marks the first active construction stage for Bay Grove Residences Phase 1, introducing early physical development progress across the Island B waterfront site.

Construction advancement within Dubai Islands supports long term positioning for waterfront residential demand, beachfront infrastructure growth, and Nakheel’s broader coastal expansion strategy across Dubai Islands.

Dubai Golden Visa Through The Edge

Eligible The Edge investments may qualify buyers for long term UAE residency.

Escrow Protection for The Edge

Buyer payments remain protected through a DLD regulated escrow account linked to construction milestones.

The Edge Project Details

The Edge is a contemporary twin tower apartment development within Business Bay introducing canal front residences, skyline facing apartments, and modern urban lifestyle environments near Downtown Dubai.

The project combines contemporary residential layouts, wellness focused amenities, and long term investment positioning within Select Group’s central Dubai waterfront development.

The Edge by Select Group residential towers with Burj Khalifa skyline view in Dubai - Presented by Tohid Fetrat

Explore The Edge Structure

The Edge construction updates connect to the wider Business Bay waterfront masterplan. Explore canal front residences, Downtown Dubai connectivity, and Select Group developments across Dubai Canal.

Business Bay Properties for Sale

Explore canal front apartments, luxury towers, and waterfront investments near Downtown Dubai.

Business Bay Community Overview

Discover Dubai Canal living, skyline towers, and central Business Bay lifestyle positioning.

Select Group Developer Profile

Explore Select Group waterfront projects, luxury residences, and Dubai investment developments.

The Edge Construction Update - FAQs

What is the current construction progress of The Edge?

As of the latest inspection conducted on 11 June 2025, The Edge has reached 42.01% construction progress.

What construction activity is currently progressing at The Edge?

The latest inspection confirms active structural construction, façade activity, and ongoing tower development across the Business Bay site.

How much construction progress was recorded since the previous inspection?

The Edge advanced from 25.59% to 42.01% construction completion between inspections.

What property types are available at The Edge?

The Edge features contemporary 1 and 2 bedroom apartments with canal connectivity and skyline facing layouts.

When is The Edge expected to be completed?

According to the latest project timeline, The Edge is expected to be completed on 11 October 2026.

Why should buyers monitor The Edge construction updates?

Construction updates provide verified inspection insights covering tower progress, development milestones, and ongoing construction activity within Business Bay.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments
Message Me

For any questions about your real estate investment, message or call me directly. I’m here to guide you toward the best opportunities in Dubai.

WhatsApp Get more information
×

Loading...