Violet at DAMAC Hills 2 by DAMAC Properties construction update April 2026 showing townhouse exterior architecture in Dubai Presented by Tohid Fetrat

DAMAC Properties · DAMAC Hills 2 · Construction Update

Violet at DAMAC Hills 2 Construction Update - April 2026

April 2026 Inspection Records Violet at 85.44% Construction Progress Across 526 Townhouses

Envelope, MEP, finishes, and infrastructure packages all run at advanced stages across Violet's 526 townhouses, verified at 85.44 percent in the April 2026 RERA inspection.

Direct advisor access. Every message answered personally, never by a call center.

85.44%Construction Progress
14 April 2026Inspection Date
June 2026Developer Anticipated Date
2734DLD Project Number

Verified DLD Inspection Data

Violet Construction Snapshot

A 15.21 point gain since the previous recorded inspection puts Violet at 85.44%, past the stage where the 526 townhouses are being built and into the stage where they are being finished, fitted, and connected.

Project Name

Violet at DAMAC Hills 2

Project Number

2734

Project Status

Active

Construction Progress

85.44%

Inspection Date

14 April 2026

Construction Start

23 October 2023

Total Units

526 townhouses

Total Built Area

73,408.11 sq m

Expected Completion

No date published in the DLD record

Data source: RERA inspection conducted on 14 April 2026, tracked against DLD inspection records. The expected completion field for project 2734 is empty in the register as of this update, so the developer's anticipated completion date of June 2026, published on the Violet payment plans, is the only completion date on the file. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: July 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else.

This Inspection Cycle

Violet Construction Progress Summary

Violet moved from 70.23% at its previous recorded inspection to 85.44% on 14 April 2026, a gain of 15.21 points. The inspector's note for this cycle is specific: enabling, foundation, structural, and internal works are recorded as substantially completed, while envelope, MEP, finishes, and infrastructure are all at advanced stages and external works sit at different stages across the site. In a 526 unit townhouse project that distinction matters, because the remaining percentage is spread across streets rather than concentrated in one building.

Completed
  • Enabling and foundation works across plot 11385
  • Concrete structure and blockwork on the G+1+R townhouses
  • Internal works recorded as substantially completed at inspection
In Progress at 85.44%
  • Envelope packages, described as at an advanced stage
  • MEP installation across the townhouse clusters
  • Internal and external finishes on the 526 units
  • Community infrastructure serving the Violet cluster
  • External works, progressing at different stages street by street
Ahead of Handover
  • Remaining RERA inspection cycles toward 100%
  • Building completion certificate procedures
  • Unit by unit handover once completion is certified
Next inspectionPublished in the DLD project register after the next RERA site visit; this page updates with each cycle.
Completion targetThe DLD register carries no expected completion date for project 2734. The developer's anticipated date of June 2026 has now passed, and the last published reading, 85.44% on 14 April 2026, was short of completion. No revised date has been published as of this update.
Remaining distance14.56 percentage points separate the April 2026 reading from a completed project.
Registered developerProject 2734 is registered in the DLD record to Front Line Investment Management L.L.C, developer number 1021, with the trust account held at Emirates NBD Bank.

Payment Linked Progress

What 85.44% Progress Means for Violet Buyers

Both published Violet payment plans put the single largest installment at completion: 40 percent on the 60/40 launch plan, 30 percent on the 70/30 regular plan. Both also carry construction linked triggers at 70, 80, and 90 percent. At a recorded 85.44 percent, that puts most Violet buyers between two triggers, which is exactly when the paperwork is worth rereading. Four actions matter at this stage.

Before Remaining Installments

Verify the escrow account

Any payment still ahead of handover belongs in the DLD regulated escrow account registered for project 2734, held with Emirates NBD Bank per the April 2026 inspection record. Violet escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.

Between the 80% and 90% Triggers

Reread your SPA milestone schedule

The published plans release money at 70, 80, and 90 percent completion, and your SPA, not the brochure, defines which plan applies to your unit and what percentage those triggers are read against. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the certified milestones.

Window Open Now

Book the snagging window

At 85.44% recorded progress, with the developer's own anticipated date already behind it, Violet is inside the booking window for a pre handover inspection. Violet snagging inspection guide covers the booking window before acceptance.

Every Cycle

Track the remaining cycles

With no expected completion date published in the register, the inspection reading is the only dated evidence of where Violet actually stands. Violet construction updates hub keeps the final stretch free of surprises.

General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 85.44%?

Entering a townhouse project this late trades payment plan runway for a structure you can see: the concrete is up, the internal works are recorded as substantially complete, and the remaining choice is between the units still available. Every payment goes to the DLD-registered escrow account for project 2734, released against certified construction progress.

Entering Now at 85.44%
  • Certified structure: the inspection record above is the risk picture
  • Finishing works, not foundations, decide the remaining timeline
  • The completion installment, 30 or 40 percent, arrives soon rather than in years
Typical Launch Entry
  • Construction risk carried from excavation to handover
  • Two to four years of waiting is the usual delivery horizon
  • Longer installment runway, priced at launch levels
AED 1.87M ≈ USD 509KStarting Price
60/40 or 70/30Published Payment Plans
2,352 to 2,415 sq ftSellable Area, 4 Bedrooms
Ask What Is Available at Violet

Availability at this stage moves unit by unit rather than by release, and shifts between cycles; ask for the current list before planning around a specific type.

About the Development

Violet Project Details

Violet at DAMAC Hills 2 by DAMAC Properties contemporary townhouse with private swimming pool landscaped garden and outdoor terrace in Dubai Presented by Tohid Fetrat
DAMAC Hills 2 · DAMAC Properties

With structure and internal works recorded as substantially completed, Violet is a finishing stage cluster of 526 four bedroom G+1+R townhouses in two prototypes, sized 2,352 and 2,415 sq ft. Starting prices: AED 1.87M ≈ USD 509K.

For buyers entering at this stage, the trade off is a short remaining wait against a large completion installment, on a project whose expected completion date is currently absent from the DLD record.

Violet at DAMAC Hills 2 Project Guide

Site Context This Cycle

Explore Violet Location on Dubai Map

Violet occupies plot 11385 in Madinat Hind 4 per the April 2026 inspection record, on the DAMAC Hills 2 edge that faces Water Town, and the shape of the plot explains the shape of this cycle's report: 526 townhouses are delivered street by street, so envelope, finishes, and external works sit at different stages across the clusters rather than advancing as a single front.

Because DAMAC Hills 2 is an occupied master community with its Water Town, Sports Town, and Down Town amenities already running, Violet is finishing into a neighborhood that already works, which matters for buyers weighing an occupancy or rental plan against an inspection record that is still 14.56 points short of complete. See the project's position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Violet at DAMAC Hills 2 on Dubai Map

Buyer Resources for This Project

Investing in Violet During Final Construction Progress

At 85.44%, the questions that decide a Violet purchase change from build risk to money and handover: where the remaining installments sit, what residency a purchase supports, and how a townhouse gets inspected before it is accepted.

Violet at DAMAC Hills 2 by DAMAC Properties construction update overlooking the townhouse community and landscaped surroundings in Dubai Captured by Tohid Fetrat
You Are Here

Violet Construction Updates

This page: the 14 April 2026 RERA reading for Violet, recorded at 85.44 percent construction progress.

Violet at DAMAC Hills 2 by DAMAC Properties Golden Visa eligibility for townhouse buyers in Dubai Presented by Tohid Fetrat

Violet Golden Visa

Check whether a Violet townhouse purchase clears the property value threshold for Golden Visa eligibility.

Read Violet Golden Visa Guide
Violet at DAMAC Hills 2 by DAMAC Properties escrow account protection for townhouse buyers in Dubai Presented by Tohid Fetrat

Violet Escrow Account

Confirm the DLD registered Emirates NBD escrow account for project 2734 before releasing any remaining installment.

Verify Violet Escrow Account
Violet at DAMAC Hills 2 by DAMAC Properties snagging inspection for townhouse exterior and architectural finishes in Dubai Presented by Tohid Fetrat

Violet Snagging Inspection

At 85.44 percent recorded progress, document defects independently before you accept your Violet townhouse.

Book Violet Snagging Inspection

Update Timeline

Other Violet Construction Updates

Every published reading for Violet lands in one place, so the record between 70.23 percent and handover stays readable in order.

All Violet Construction Updates

FAQs

Violet at DAMAC Hills 2 Construction Progress in April 2026: Frequently Asked Questions

As of the RERA inspection conducted on 14 April 2026, Violet stands at 85.44% construction progress in the DLD project register, against 70.23% at the previous recorded inspection.

No. As of the 14 April 2026 inspection, the expected completion field for project 2734 is empty in the register, which is why no DLD completion date appears anywhere on this page. The only completion date on the file is the developer's anticipated date of June 2026, printed on the Violet payment plans. How inspection cycles lead to completion certification is covered on the Violet construction updates hub.

Yes, and it is worth saying plainly. The anticipated completion date published on the Violet launch and regular payment plans is June 2026. The most recent published inspection, dated 14 April 2026, recorded 85.44%, which is 14.56 points short of a completed project, and no revised date has appeared in the DLD register as of this update. The next inspection reading is the document that will show where delivery now stands.

The inspection notes record enabling, foundation, structural, and internal works as substantially completed, with envelope, MEP, finishes, and infrastructure all progressing at advanced stages and external works progressing at different stages across the site. The progress status for the main contract is recorded as progressing.

Both published plans carry completion linked triggers: the 60/40 launch plan releases 5% at 80% completion and 5% at 90%, while the 70/30 regular plan releases 4% at each of 70%, 80%, and 90% villa completion. A reading of 85.44% therefore sits between the 80% and 90% triggers. Whether your own installment is read against the RERA percentage or against the developer's certification of your specific villa is defined in your SPA, not in the register.

Yes, the window is open. A pre handover inspection is normally booked once a project passes roughly 70% or comes within nine months of expected handover, and Violet clears both tests as of the April 2026 reading, with its anticipated date already behind it. Booking ahead of the handover notice avoids compressing the inspection and the defect rectification into the same few weeks.

The project description in the inspection report reads 526 G+1+R villas, designed as a concrete structure and block with internal and external finishes. In the sales collateral these are the 4 bedroom townhouses in two prototypes, 312 units of 2,352 sq ft and 214 units of 2,415 sq ft, which together account for the 526 units in the register.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the April 2026 inspection record for Violet at DAMAC Hills 2 correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts