Natura at DAMAC Hills 2 Construction Updates

The Verified Build Record Behind 439 Townhouses at DAMAC Hills 2

Natura at DAMAC Hills 2 reached 85.57% construction at its 13 May 2026 RERA inspection, with 439 townhouses moving through internal finishes and external works toward handover.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

85.57%Construction Progress
13 May 2026Latest RERA Inspection
439 TownhousesTotal Units
Project 2735DLD Registration

Construction Snapshot

Natura at DAMAC Hills 2 at a Glance

Natura is DAMAC Properties' 439-townhouse cluster inside DAMAC Hills 2, registered with the Dubai Land Department on 11 August 2023 and under construction since 23 October 2023 across a built-up area of 60,071.74 sq m. By the 13 May 2026 inspection the recorded figure stood at 85.57%. What makes this record unusual is the completion field: the DLD entry for project 2735 carries no published completion date, which leaves the inspection percentages, not a registered deadline, as the only reliable way to read where the build actually stands.

DLD Project Number

2735

Project Status

Active

Construction Start

23 October 2023

Total Units

439 townhouses

Total Built-Up Area

60,071.74 sq m

Registered Completion Date

Not published in the DLD record

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

Natura at DAMAC Hills 2 Construction Update Timeline

This record is short and recent. The DLD inspection panel for project 2735 publishes a reading of 85.57% dated 13 May 2026 and a preceding reading of 68% with no date attached to it. Those 17.57 points are the only verified movement on file, so the track and the table below show precisely what has been recorded for Natura and nothing beyond it.

Inspection MonthConstruction ProgressInspection DateFull Update
May 202685.57%13 May 2026View the May 2026 update
Preceding inspection68%Date not published in the DLD recordNo site update published for this reading
!

Reading the dates: project 2735 has no completion date in its DLD entry, and DAMAC's launch material for Natura carried an anticipated completion of June 2026, which has now passed while the last recorded figure is 85.57% from 13 May 2026. Neither number is a handover date: delivery is confirmed by DAMAC Properties as final inspections and approvals complete. Ask for the current handover status on WhatsApp.

Pace Analysis

How Fast Natura at DAMAC Hills 2 Has Been Built

With two readings on file and only one of them dated, the honest pace read for Natura is the whole-build average and the size of the last recorded step:

  • Oct 2023 to May 2026: whole build, construction start to 85.57%About 2.8 points per month
  • Preceding reading to May 2026: 68% to 85.57%, interval date not published17.57 points added

Roughly thirty months of building produced 85.57 points of recorded progress, an average that a villa and townhouse cluster can hold in a way a single tower usually cannot, because 439 units are built in parallel rows rather than floor by floor. The 13 May 2026 inspection puts numbers behind that: enabling, foundation and structural works are recorded as closed out, while internal works, MEP, envelope, finishes and the surrounding infrastructure were all logged at an advanced stage on the same visit. That is the signature of a project in its last band, where several trades run at once and the percentage climbs in smaller increments than the structure phase delivered. What cannot be computed yet is the velocity of that final band, since the 68% reading is published without its date. For a buyer, the practical read is simple: Natura is past the phase where delays are structural, and into the phase where handover depends on finishes, testing and approvals.

Get the Next Inspection Figure First

Tell me you are tracking Natura at DAMAC Hills 2 and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About Natura at DAMAC Hills 2

The build percentage only matters in the context of what is being delivered. The full project guide covers what buyers are tracking toward on this page:

Natura at DAMAC Hills 2 by DAMAC Properties contemporary townhouse front elevation with covered parking balconies landscaped surroundings and modern architecture in Dubai Presented by Tohid Fetrat

Natura at DAMAC Hills 2 Project Guide

Layouts across 439 four-bedroom townhouses in the TH12-4E and TH12-4M types, the ground-floor garden and roof-floor expansion format, the position opposite Water Town, and the full investment case behind DAMAC's Natura cluster.

View the Natura Project Guide

Considering a Near-Handover Entry?

Availability at Natura continues to shift as the cluster approaches completion. If the record on this page is what brought you here, ask me for current availability before remaining inventory narrows further.

Ask About Remaining Availability on WhatsApp

Stage Record

Natura Build Stages, Mapped to the Inspection Record

Rather than a generic construction sequence, each stage below is anchored to what the DLD and RERA record actually confirms for Natura, including the works logged as complete and the works logged as in progress at the 13 May 2026 inspection.

Aug 2023 to Oct 2023

Registration and Site Activation

Project 2735 was registered on 11 August 2023, with construction recorded as starting ten weeks later on 23 October 2023 on the plot in Madinat Hind 4.

Recorded complete by May 2026

Foundations and Concrete Structure

The 13 May 2026 inspection logs enabling, foundation and structural works as finished across all 439 units, each built to a G+1+R concrete and block structure.

In progress, 13 May 2026

Envelope, Internal Works and MEP

Building envelope, internal partitions and mechanical, electrical and plumbing installations were all recorded at an advanced stage at the 85.57% inspection.

In progress, 13 May 2026

Infrastructure and External Works

Roads, utilities and the external works serving the cluster were logged as advancing alongside the units themselves rather than trailing behind them.

Current Phase 85.57% at 13 May 2026 onward

Finishes, Commissioning and Handover

The remaining 14.43 points cover internal and external finishes, systems testing and commissioning, and the approvals that precede handover to Natura buyers.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Natura's own record.

Buyer Position

Tracking Your Position at Natura at DAMAC Hills 2

This page is one of four project resources that together cover a Natura purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Natura at DAMAC Hills 2 by DAMAC Properties contemporary townhouses with landscaped private gardens spacious balconies and modern facade design during construction update in Dubai Presented by Tohid Fetrat
You Are Here

Natura Construction Updates

This page: the verified inspection record for Natura at DAMAC Hills 2, from groundbreaking to handover.

Natura at DAMAC Hills 2 by DAMAC Properties contemporary townhouses highlighting Golden Visa eligibility opportunity in Dubai Presented by Tohid Fetrat

Natura Golden Visa

Check whether a qualifying Natura townhouse purchase supports 10-year UAE Golden Visa residency eligibility.

Read the Natura Golden Visa Guide
Natura at DAMAC Hills 2 by DAMAC Properties aerial community view highlighting escrow account protection and secure property investment in Dubai Presented by Tohid Fetrat

Natura Escrow Account

Verify the Emirates NBD escrow account holding Natura installments released against certified construction milestones.

Verify the Natura Escrow Account
Natura at DAMAC Hills 2 by DAMAC Properties townhouse balcony overlooking landscaped streets and contemporary residences highlighting independent snagging inspection in Dubai Presented by Tohid Fetrat

Natura Snagging Inspection

At 85.57% recorded progress, arrange independent defect documentation before you accept your Natura townhouse.

Book Natura Snagging

Approaching Handover

Between 85.57% and Handover: What Natura Buyers Should Do Now

The gap between the current reading and 100% is closed by finishes, commissioning and approvals rather than visible construction, which makes this the window where buyer preparation matters most. Handover notices at comparable projects typically give buyers a short window to complete their appointment, so the three steps below happen now, not when the notice arrives.

First, arrange independent snagging so defects in your townhouse are documented before you accept it; the Natura snagging inspection page covers timing and what gets inspected across a three-storey unit with a garden and a roof terrace.

Second, confirm your remaining installments against the certified milestones on the Natura escrow account page. The launch payment plan tied installments to the 80% and 90% completion milestones, so at 85.57% recorded the 90% trigger is the next one for buyers on that structure, followed by the balance on completion.

Third, if your purchase may qualify for residency, settle eligibility before handover through the Natura Golden Visa guide, since the title deed timing affects the application path.

Send me your unit number on WhatsApp and I will tell you what the May inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore DAMAC Hills 2 Structure

A build record is only half the picture; the other half is what is already standing around it. These three pages put Natura's progress in its community and developer context:

Community view of DAMAC Hills 2 showcasing properties for sale including villas, townhouses, and apartments in Dubai. Presented by Tohid Fetrat

DAMAC Hills 2 Properties for Sale

Browse villas, townhouses, and apartments delivering across DAMAC Hills 2 while Natura closes its final stretch.

See DAMAC Hills 2 Properties for Sale
DAMAC Hills 2 by DAMAC Properties community park with football field tennis courts basketball courts landscaped pathways and residential villas in Dubai - Presented by Tohid Fetrat

DAMAC Hills 2 Community Overview

See how parks, sports facilities, and Water Town amenities are already built around Natura's plot.

Explore the DAMAC Hills 2 Community
DAMAC developer iconic modern tower with unique architectural design and Dubai skyline at sunset Presented by Tohid Fetrat

DAMAC Properties Developer Profile

Review DAMAC Properties' delivery record across DAMAC Hills 2 before Natura reaches its handover inspections.

View the DAMAC Properties Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

Natura at DAMAC Hills 2 Construction Updates Frequently Asked Questions

Natura at DAMAC Hills 2 is an active DLD-registered project (number 2735) in its finishes and commissioning phase, recorded at 85.57% at the inspection of 13 May 2026. The full record is in the inspection timeline above.

The 13 May 2026 inspection recorded 85.57% construction progress, 17.57 points above the preceding reading of 68% shown in the same DLD panel. That preceding reading is published without an inspection date, so the interval behind those points cannot be verified. Site conditions from this period are documented in the May 2026 construction update.

Measured across the whole build, from the 23 October 2023 construction start to the 13 May 2026 inspection, Natura has averaged about 2.8 percentage points per month to reach 85.57%. A phase-by-phase velocity cannot be computed from the current record, because the 68% preceding reading carries no published inspection date. The full breakdown is in the pace analysis above.

The DLD record for project 2735 carries no published completion date, so there is no registered deadline to read the progress against. DAMAC's launch material listed an anticipated completion of June 2026, while the 13 May 2026 inspection recorded 85.57%, which placed the project in its finishing phase rather than at delivery. Handover is confirmed by DAMAC Properties as final inspections and approvals complete, and this page's record is updated when the next inspection is recorded.

DLD registration records show 439 units for project 2735, described in the inspection record as G+1+R villas, with a total built-up area of 60,071.74 sq m across the Natura cluster.

The project was registered with the Dubai Land Department on 11 August 2023, and construction was recorded as starting on 23 October 2023. Every percentage on this page is measured from that start date, including the 85.57% recorded on 13 May 2026.

Natura is a cluster of 439 four-bedroom townhouses in the TH12-4E and TH12-4M layouts, each a G+1+R home with a ground-floor garden, balconies, and a roof floor designed for future expansion, positioned opposite Water Town. Layouts and the investment case are in the Natura at DAMAC Hills 2 project guide.

With the project at 85.57% as of 13 May 2026, buyers should arrange independent defect documentation through the Natura at DAMAC Hills 2 snagging inspection guide, check remaining installments against the certified milestones set out on the Natura at DAMAC Hills 2 escrow account page, and settle residency questions through the Natura at DAMAC Hills 2 Golden Visa guide before the title deed is issued.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments - Presented by Tohid Fetrat

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the Natura at DAMAC Hills 2 construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get the Latest Status