Emaar Properties · Arabian Ranches 3 · Construction Update
Anya 2 at Arabian Ranches 3 Construction Update - March 2026
March 2026 Inspection Records Anya 2 at 94.93% Construction Progress in Arabian Ranches 3
MEP, external envelope, internal finishes, and external works were progressing at advanced stages across the 362 Anya 2 townhouses at the 17 March 2026 RERA inspection.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Anya 2 at Arabian Ranches 3 Construction Snapshot
<strong>A 94.93% reading on 17 March 2026</strong> puts Anya 2 in the handover preparation band: every structural package is reported complete, and the points still open sit in services, finishes, and the ground around the townhouses.
Anya 2 at Arabian Ranches 3
2609
Active
94.93%
17 March 2026
26 June 2023
362 townhouses
72,269.27 sq m
30 December 2026
Data source: RERA inspection conducted on 17 March 2026, tracked against DLD inspection records for project 2609. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. The hero image is a developer rendering, not a site photograph. Last updated: September 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Anya 2 at Arabian Ranches 3 Construction Progress Summary
Registered with the DLD on 17 March 2023 and started on 26 June 2023, Anya 2 reached 94.93% exactly three years after registration, leaving 5.07 points to close before the 30 December 2026 completion date. The March 2026 notes describe a site where the building work is done and the completing work is not.
- Enabling works across the cluster
- Foundation works for all 362 townhouses
- Structural works: concrete frame and blockwork for the G+1 homes
- Internal works, as listed in the March report
- MEP systems, reported at an advanced stage
- External envelope across both storeys
- Internal finishes inside the townhouses
- External works around the cluster
- Infrastructure works serving the site
- Remaining RERA inspection readings toward 100%
- Handover notices issued under each buyer's SPA
- Handover scheduled for Q4 2026, against a DLD completion date of 30 December 2026
Payment Linked Progress
What 94.93% Progress Means for Anya 2 Buyers
Anya 2 launched on a 90/10 schedule that left the final 10% for construction completion, so at 94.93% the obligations still ahead are few but consequential: the completion instalment, the handover notice, and the inspection of a finished home. Four actions matter at this reading.
Verify the escrow account
Any payment still due before handover belongs only in the DLD regulated escrow account for project 2609, which the March report lists with Mashreq Bank PSC as trust bank. Anya 2 escrow account verification comes before any transfer, and the lookup takes about two minutes against the official DLD project record.
Reread your SPA completion clauses
Read how your sale and purchase agreement defines the completion instalment and the handover notice period, and set both against the 30 December 2026 completion date on record. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Line up the snagging inspection
At 94.93% and inside ten months of the registered completion date, Anya 2 has entered the practical window for booking an independent pre handover inspection of a G+1 townhouse. Anya 2 snagging inspection guide sets out what to check before acceptance.
Follow the final readings
With 5.07 points left, each remaining RERA reading narrows the gap to completion. Anya 2 construction updates hub lists every dated reading in one place.
General framework, not legal advice: completion instalments, notice periods, and handover obligations are defined by your own SPA and the DLD record, and both should be read directly.
Buying at 94.93%?
Buying into Anya 2 this late gives up most of the payment runway in exchange for visibility: the structure is reported complete, the completion date is on record, and the choice comes down to which townhouses remain and on what terms. Every payment goes to the DLD-registered escrow account for project 2609, released against construction progress recorded in RERA inspections.
- Structural and internal works reported complete on 17 March 2026
- About nine and a half months to the 30 December 2026 completion date
- Terms confirmed unit by unit, not the 2023 launch schedule
- Construction risk held from the first ground works onward
- A multi-year wait is the normal delivery horizon
- The full installment runway, at launch-stage pricing
Limited units available per the project page as of this update; availability shifts between cycles.
About the Development
Anya 2 at Arabian Ranches 3 Project Details

With enabling, foundation, structural, and internal works reported complete in March 2026, Anya 2 is a finishing stage cluster of 362 G+1 townhouses with 3 and 4 bedrooms across the Luna, Aria, and Iris styles. Starting prices: AED 2.70M ≈ USD 735K.
For a buyer entering now, the trade off is less payment runway in exchange for a completion date close enough to plan a move or a first tenancy around, with handover scheduled for Q4 2026.
Anya 2 at Arabian Ranches 3 Project GuideSite Context This Cycle
Explore Anya 2 at Arabian Ranches 3 Location on Dubai Map
Anya 2 occupies plot 7970 in Wadi Al Safa 5, on the outer edge of Arabian Ranches 3 along Sheikh Zayed bin Hamdan Al Nahyan Street, beside a community entrance and the original Anya cluster. On a low-rise G+1 cluster like this, the packages still open in March 2026, external works and infrastructure, are the streets, landscaping, and connections between homes that turn finished houses into a finished neighbourhood.
Arabian Ranches 3 extends a villa district that began in 2004, with Arabian Ranches I and II next door and Academic Road and Emirates Road placing Global Village about 5 minutes away and Downtown Dubai and DXB about 20 minutes. For buyers at 94.93%, that means the commute and the setting can be tested in person today rather than taken from a brochure. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Anya 2 at Arabian Ranches 3 in the Final Construction Stage
Close to handover, the questions shift from whether Anya 2 gets built to how buyers take delivery safely. Each resource below is matched to the March 2026 position.

Anya 2 Construction Updates
This page: the 17 March 2026 RERA reading for Anya 2, with its open works listed.

Anya 2 at Arabian Ranches 3 Golden Visa: 362 Townhouses
Both townhouse tiers at Anya 2 at Arabian Ranches 3 qualify, so Emaar's 362-townhouse cluster needs no second property.
Read Anya 2 Golden Visa Guide
Anya 2 at Arabian Ranches 3 Escrow, Certified Past 97%
Anya 2 at Arabian Ranches 3 escrows 362 units with Mashreq as DLD project 2609, 97.01% certified in July 2026.
Verify Anya 2 Escrow Account
Anya 2 at Arabian Ranches 3 Snagging: Luna, Aria and Iris Townhouses
Anya 2 at Arabian Ranches 3 is a gated cluster of 362 attached Emaar townhouses, each with covered parking.
Book Anya 2 Snagging InspectionUpdate Timeline
Other Anya 2 at Arabian Ranches 3 Construction Updates
March 2026 is the first monthly report in this series for Anya 2; follow the readings that come after it, one DLD record at a time, up to handover.
All Anya 2 Construction UpdatesWhere This Update Fits
Explore the Wider Picture Around Anya 2
The March 2026 inspection records Anya 2 at Arabian Ranches 3 at 94.93% construction progress. Enabling, foundation, structural, and internal works are reported complete, while MEP, external envelope, internal finishes, external works, and infrastructure remain in advanced stages.

Arabian Ranches 3 Properties for Sale
Browse townhouses and villas for sale in Arabian Ranches 3 - compare projects, prices and payment plans.
See Arabian Ranches 3 Properties for Sale
Arabian Ranches 3: Thirteen Villa and Townhouse Clusters Around a Central Park
Arabian Ranches 3 is a gated Emaar masterplan in Dubailand with 4,000 homes, sports facilities and direct access to Emirates Road.
Explore the Arabian Ranches 3 Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileFAQs
Anya 2 at Arabian Ranches 3 Construction Progress in March 2026: Frequently Asked Questions
The RERA inspection of 17 March 2026 recorded Anya 2 at Arabian Ranches 3 at 94.93% construction progress in the DLD project register under project number 2609, with the project status shown as Active. That reading left 5.07 percentage points to reach 100% on the date it was taken.
The March 2026 record showed no slippage: the DLD register listed expected completion as 30 December 2026, in line with handover scheduled for Q4 2026, and the inspection report classed the main contract as progressing. Registered completion dates can be revised between inspection cycles, so the date to rely on is the one in the DLD record current at the time of a payment decision; later readings are compared on the Anya 2 construction updates hub.
The inspection notes record enabling, foundation, structural, and internal works as completed, with MEP, external envelope, internal finishes, and external works "progressing at advanced stages" and infrastructure works "progressing as well". The notes also contain the report's own phrase "Mobilization works on going", quoted here as written rather than read as a new start on site. The report describes the project as 362 townhouses (G + 1) built with a concrete structure and block.
It is a developer rendering of an Anya 2 townhouse exterior, not a photograph of the site on 17 March 2026, so it shows no construction progress. The eight photos attached to the RERA inspection record belong to the official report and are not reproduced here; the 94.93% figure comes from the DLD record, not from any image.
After the 17 March 2026 reading, 5.07 percentage points remained, with 288 days to the registered completion date of 30 December 2026. The open packages were MEP, the external envelope, internal finishes, external works, and infrastructure; enabling, foundation, structural, and internal works were no longer outstanding.
At 94.93%, the steps ahead were the completion instalment, the handover notice defined in each SPA, and a snagging inspection of the finished townhouse before acceptance. On the 2023 launch schedule, the final 10% was tied to construction completion with an estimated date of December 2026, while later buyers hold terms set unit by unit. How escrow, notices, and the final readings fit together over the whole build is covered on the Anya 2 construction updates hub.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the March 2026 inspection record for Anya 2 at Arabian Ranches 3 correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.