Binghatti Ruby Construction Updates
One Mixed-Use JVC Tower, Tracked Upward From a Finished Substructure
Binghatti Ruby read 46.43% in the Dubai Land Department register for the 23 July 2026 inspection, its Jumeirah Village Circle tower climbing above completed foundations toward handover.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Binghatti Ruby at a Glance
A single mixed-use tower in Jumeirah Village Circle, Binghatti Ruby is entered in the Dubai Land Department register as project 3533, with 572 residences on 18 floors above a ground floor with retail, four podium parking levels and two office floors, per the developer fact sheet. Its record opens unusually: construction started on 01 January 2025, three months before the project was registered on 07 April 2025, and the first dated reading on this page, 46.43% for the inspection of 23 July 2026, arrived 568 days into the build. Because parking, offices and retail fill the lower levels, every apartment sits above every non-residential floor in this tower, at the top of the structure still rising.
3533
Active
01 January 2025
572 residential units
38,308.25 sq m
28 February 2026 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Binghatti Ruby Construction Update Timeline
So far the Binghatti Ruby record holds one dated reading: 46.43% in the Dubai Land Department register for the RERA inspection of 23 July 2026. The same register card shows an earlier figure of 20.04% under Previous Inspection but prints no date beside it, so that figure appears on the track below as an undated dot rather than as a table row. The single row links the July 2026 update, which sets out the RERA inspection notes from that visit.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| July 2026 | 46.43% | 23 July 2026 | View the July 2026 update |
Reading the dates: the registered completion date for project 3533 in the DLD record is 28 February 2026, and it had already passed when the register posted 46.43% for the inspection of 23 July 2026. The current handover target for Binghatti Ruby is Q4 2026, so the completion date in force should be checked with Binghatti and on Dubai REST before relying on either date.
Pace Analysis
How Fast Binghatti Ruby Has Been Built
With one dated reading on record, the Binghatti Ruby pace can only be read as arithmetic from the 01 January 2025 construction start, not yet as a measured rate between two inspections:
- Jan 2025 to Jul 2026: whole-build average from the start to 46.43% on 23 July 2026, arithmetic and not a forecastAbout 2.45 points per month
- Previous register reading to 23 July 2026: 20.04% (undated) to 46.43%No dated pair to measure
- 23 July 2026 to handover: 46.43% to 100%53.57 points still to record
That leaves this tower with a single point and an average rather than a curve. The average spreads 46.43 points across 568 days of construction in 30-day months and cannot show whether the climb was steady or bunched, and the undated 20.04% field cannot settle the question because the register never says when it was taken. What the RERA report of 23 July 2026 does fix is the shape of the work: enabling, piling, foundations and substructure are finished, while the superstructure, MEP, internal works and finishes are moving at the same time. For an end user planning around the Q4 2026 target and for an investor judging delivery consistency, the next dated Binghatti Ruby reading is the one to watch, because it gives the record its first measurable rate between two inspections.
Get the Next Inspection Figure First
Tell me you are tracking Binghatti Ruby and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Binghatti Ruby at JVC
A register percentage means more beside what it is building toward. The project guide covers the apartments this record is tracking:

Binghatti Ruby: A Mixed-Use JVC Tower with Two Office Floors
Binghatti Ruby is a mixed-use tower in Jumeirah Village Circle with 572 studio to three bedroom apartments over ground-floor retail.
View the Binghatti Ruby Project GuideConsidering a Mid-Construction Entry?
Binghatti Ruby is offered with limited units available, and what remains open shifts between inspection cycles. If the record on this page is what brought you here, ask me for current availability before the remaining choice narrows further.
Ask About Remaining Availability on WhatsAppStage Record
Binghatti Ruby Build Stages, Mapped to the Inspections
Each stage below is tied to the dates Binghatti Ruby actually carries in the DLD register and the RERA report of 23 July 2026, so the sequence shows where this tower stood at its one dated reading rather than a textbook order of works.
Start, Registration, and Enabling Works
Construction started on 01 January 2025 and project 3533 was registered on 07 April 2025; the enabling works of this period are recorded as completed.
Piling, Foundations, and Substructure
The RERA report of 23 July 2026 lists piling, foundation and substructure works as completed, with the earlier 20.04% register reading undated.
Superstructure Over the Podium
Recorded at 46.43% on 23 July 2026 with the superstructure progressing, the tower rising through its podium, office and 18 residential floors.
MEP, Internal Works, and Finishes
MEP, internal works and internal finishes were already progressing on 23 July 2026, running inside the building alongside the rising structure.
Completion and Handover
The 53.57 points between the 23 July 2026 reading and 100% close this stage; the registered completion date of 28 February 2026 has passed, and the handover target is Q4 2026.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Binghatti Ruby's own record.
Buyer Position
Tracking Your Position at Binghatti Ruby
This page is one of four project resources that together cover a Binghatti Ruby purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Binghatti Ruby Construction Updates
This page: the Binghatti Ruby build record, from the January 2025 start to Q4 2026 handover.

Binghatti Ruby Golden Visa: Only the 3 Bedroom Clears Alone
Binghatti Ruby, a mixed-use Jumeirah Village Circle tower of 572 units, qualifies only through its 3 bedroom apartment.
Read the Binghatti Ruby Golden Visa Guide
Binghatti Ruby Escrow, Held by The National Bank of Fujairah
The National Bank of Fujairah holds Binghatti Ruby escrow, DLD project 3533, 628 units, 46.43% certified July 2026.
Verify the Binghatti Ruby Escrow AccountApproaching Handover
Between 46.43% and Handover: What Binghatti Ruby Buyers Should Do Now
At 46.43% on 23 July 2026, Binghatti Ruby sits inside the 50% construction share of its 20/50/30 plan, the stretch where installments leave a buyer's account while the superstructure is still going up. Each check below belongs before the next installment falls due, not after it has been paid.
First, make sure every construction installment is paid into the escrow account held with National Bank of Fujairah for project 3533; the Binghatti Ruby escrow account page shows how to match it against the DLD record.
Second, if residency is part of the plan, settle the tier question early: only the 3 bedroom apartment reaches the Golden Visa property value threshold on price, and the Binghatti Ruby Golden Visa guide explains how that works for an off-plan purchase.
Third, keep the apartment itself in view: layouts, the 30% due on handover and the Q4 2026 target are set out in the Binghatti Ruby project overview, so each new reading can be weighed against what you are actually buying.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore JVC Structure
A single tower's record reads better against its district. These three pages set Binghatti Ruby's progress beside Jumeirah Village Circle, its listings, and its developer:

Jumeirah Village Circle: Five Imtiaz and Binghatti Towers in New Dubai
Jumeirah Village Circle, Nakheel's freehold ring of ten districts in New Dubai, lists apartments in five Imtiaz and Binghatti towers.
See JVC Properties for Sale
JVC Community Overview
Read the Jumeirah Village Circle guide: Nakheel's freehold community of apartments, townhouses and villas with strong rental yields.
Explore the JVC Community
Binghatti: Record Construction Speed and Branded Towers With Bugatti and Mercedes-Benz
Binghatti has delivered more than 60 projects since 2008, with 27 under development and two master communities across Dubai.
View the Binghatti Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Binghatti Ruby Construction Updates Frequently Asked Questions
Binghatti Ruby is an Active project in the Dubai Land Department register (number 3533), under construction at 46.43% as of the inspection dated 23 July 2026. The RERA report of that date records the substructure as complete and the superstructure, MEP and internal finishes as progressing; the dated record is in the inspection timeline above.
The register reading for Binghatti Ruby rose to 46.43% at the inspection of 23 July 2026, 26.39 points above the previous reading of 20.04%. The register gives that earlier figure no date, so the rise is stated as a difference only; the visit itself is covered in the Binghatti Ruby July 2026 construction update page.
Progress at Binghatti Ruby is tracked from two official records for project 3533: the Dubai Land Department register, which carried the 46.43% reading for 23 July 2026, and the RERA Independent Progress Monitoring Report of the same date, which lists the works completed and in progress but prints no percentage. Each new dated reading is added to this page, and the method used across the site is set out on the Dubai Construction Updates hub.
Binghatti Ruby's DLD record shows 28 February 2026 as its registered completion date, nearly five months earlier than the 23 July 2026 inspection at which the register posted 46.43%. The current handover target is Q4 2026; because a registered date can be revised in the register, buyers read the completion date currently shown on Dubai REST for project 3533 alongside Binghatti's own schedule.
Binghatti Ruby includes 572 residences, a mix of studio, 1, 2 and 3 bedroom apartments, in one mixed-use tower. According to the developer fact sheet, consistent with the RERA report of 23 July 2026, its 18 residential floors stand above a ground floor with retail, four podium parking levels and two office floors.
Construction at Binghatti Ruby started on 01 January 2025 according to the DLD record, which also lists the project's registration on 07 April 2025; both dates are shown here as recorded. The first dated reading on this page, 46.43%, belongs to the inspection of 23 July 2026, 568 days after that start.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Binghatti Ruby construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.