June 2026 Inspection Lifts AVA at Palm Jumeirah to 91.02% Construction Progress
With enabling, foundation, and superstructure works finished, internal finishes, external envelope, and MEP packages carried AVA at Palm Jumeirah to 91.02 percent on 18 June 2026.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
AVA at Palm Jumeirah Construction Snapshot
An 11.18 point rise since the 27 February 2026 reading of 79.84% carried AVA at Palm Jumeirah past 90% and into the handover preparation band, and this is the first inspection in the series to record the concrete frame as complete.
AVA at Palm Jumeirah, Dorchester Collection
2382
Active
91.02%
18 June 2026
30 July 2022
17 residences
14,620.53 sq m
30 June 2026
Data source: RERA inspection conducted on 18 June 2026, filed with the Independent Progress Monitoring Report and tracked against DLD inspection records; the header image is a project rendering, not a photograph of the site. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
AVA at Palm Jumeirah Construction Progress Summary
Over the 111 days between the 27 February and 18 June 2026 inspections, AVA gained 11.18 points, a measured pace of about 3.02 points per month that describes the cycle just closed rather than forecasting the next. The monitoring report explains the climb: the superstructure it listed as progressing in February is recorded as completed in June, and site mobilization no longer appears among the open items.
- Enabling and foundation works on plot 2397
- Substructure across the 2 basement levels
- Superstructure, the concrete frame up to the penthouse levels, recorded on 18 June 2026
- External envelope over the finished concrete frame
- MEP systems throughout the building
- Internal finishes and internal works across the residential floors
- External works at the base of the plot
- Remaining RERA inspection cycles toward 100%
- Building completion procedures
- Buyer snagging inspections, then the handover scheduled for Q2 2026
Payment Linked Progress
What 91.02% Progress Means for AVA Buyers
OMNIYAT's 2022 plan of record for AVA puts its 12 and 24 month installments on the calendar rather than on construction stages and leaves 50% for completion, so a 91.02% reading bears on the largest payment in the schedule and on the handover notice your SPA ties to it. With the June record in hand, four actions matter most.
Verify the escrow account
The completion installment is the largest single transfer under the 2022 plan of record, and it should reach only the DLD regulated escrow account registered for project 2382 with Ajman Bank P.J.S.C. AVA at Palm Jumeirah escrow account verification comes before that transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA notice and completion clauses
Find the clauses that define completion, the notice period before the 50% installment falls due, and any provision on a registered date passing, since the 30 June 2026 date sat only 12 days after this reading and has since lapsed. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Book the snagging window
With the frame complete and internal finishes running through the residential floors in June, the glazing, terrace pools, and smart home systems each buyer will accept are taking final form. AVA at Palm Jumeirah snagging inspection timing is set out before acceptance.
Follow the final readings
8.98 points remained after 18 June 2026, and each later reading is filed in the DLD register before handover. AVA at Palm Jumeirah construction updates hub places every cycle in order.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 91.02%?
By June the structure of AVA was on record as complete and the remaining work sat in envelope, services, and finishes, so a buyer entering here was choosing among very few of the 17 residences with the completion payment close behind the purchase. Every payment goes to the DLD-registered escrow account for project 2382, released against verified construction progress.
- Frame recorded complete: the June inspection above is the risk picture
- 12 days to the registered date at this reading, since lapsed
- Half the price still due on completion under the 2022 plan of record
- Structural risk carried from enabling works to the frame
- A multi-year gap between launch and the delivery window
- Longest installment runway, priced at launch
Limited units listed available on the project page as of this update; availability shifts between cycles.
About the Development
AVA at Palm Jumeirah Project Details

By 18 June 2026 the concrete frame of AVA was recorded complete over 2 basements and a ground floor, carrying 23 floors that hold only 17 residences, from full-floor simplex homes to one duplex and a multi-level penthouse. Starting prices: AED 49.95M ≈ USD 13.60M.
Entering after the June reading trades most of the build risk for a small choice of homes and a completion payment close ahead; handover is scheduled for Q2 2026, and the DLD register still listed the project Active at 95.93% on 26 August 2026.
AVA at Palm Jumeirah, Dorchester Collection Project GuideSite Context This Cycle
Explore AVA at Palm Jumeirah Location on Dubai Map
AVA stands on plot 2397 at the entrance to Palm Jumeirah beside One at Palm Jumeirah, Dorchester Collection, and with its frame complete by June the exposed waterfront plot turned the cycle's attention outward: the external envelope around a tower designed for 270 degree views and the external works at its base were both open items on 18 June 2026.
The trunk around AVA already carries finished roads, utilities, and a delivered Dorchester Collection neighbour, and area data for that neighbouring tower puts Dubai Marina about 10 minutes and Dubai International Airport about 25 minutes away by car, so buyers timing a move in or a lease against the Q2 2026 handover schedule are planning into a working island. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in AVA at Palm Jumeirah During Handover Preparation
Above 90%, the questions for AVA buyers move from construction risk to how handover lands: residency status, the final escrow transfer, and the buyer's own inspection. Each resource below matches where the June record placed the tower.

AVA at Palm Jumeirah Construction Updates
This page: the 18 June 2026 inspection record for AVA, its concrete frame recorded as complete.

AVA at Palm Jumeirah Dorchester Collection Dubai Golden Visa: Sky Palace
OMNIYAT's 17-residence tower AVA at Palm Jumeirah Dorchester Collection Dubai qualifies at all four types, simplex to sky palace.
Read AVA at Palm Jumeirah Golden Visa Guide
AVA at Palm Jumeirah Dorchester Collection Dubai: The Ajman Bank Escrow
AVA at Palm Jumeirah Dorchester Collection Dubai escrows 17 units with Ajman Bank, DLD project 2382, 95.93% certified August 2026.
Verify AVA at Palm Jumeirah Escrow Account
AVA at Palm Jumeirah Dorchester Collection Dubai Snagging: 17 Full-Floor Residences
AVA at Palm Jumeirah Dorchester Collection Dubai is OMNIYAT's freehold tower of 17 residences at the entrance of Palm Jumeirah.
Book AVA at Palm Jumeirah Snagging InspectionUpdate Timeline
Other AVA at Palm Jumeirah Construction Updates
June 2026 is the middle reading in this series: the February page before it shows the frame still rising, and the August page after it follows AVA from here toward handover.
Where This Update Fits
Explore AVA at Palm Jumeirah Structure
The June record is one entry in a wider picture: the island around AVA's plot, the developer building it, and the Palm Jumeirah homes a buyer might compare it with.

Palm Jumeirah Dubai Properties for Sale
Browse beachfront apartments, penthouses, sky mansions and signature villas for sale across Palm Jumeirah.
See Palm Jumeirah Dubai Properties for Sale
Palm Jumeirah Dubai Community Overview
Read the Palm Jumeirah guide: Nakheel's island of signature villas, branded residences, private beaches and five-star resorts.
Explore the Palm Jumeirah Dubai Community
Omniyat: Ultra-Luxury Architectural Icons From Palm Jumeirah to Business Bay
Omniyat designs ultra-luxury waterfront residences and commercial landmarks, and held the largest share of the UAE's ultra-luxury segment in 2024.
View the OMNIYAT Developer ProfileFAQs
AVA at Palm Jumeirah Construction Progress in June 2026: Frequently Asked Questions
The RERA inspection of 18 June 2026 recorded AVA at Palm Jumeirah, DLD project 2382, at 91.02% construction progress. The same DLD inspection card shows the previous reading as 79.84%, the figure recorded on 27 February 2026, so the project gained 11.18 points between the two inspections and had 8.98 points left to reach 100%.
No. The 18 June 2026 reading of 91.02% came 12 days before the 30 June 2026 registered completion date with 8.98 points still outstanding, far more than the roughly 3.02 points per month measured between February and June. The date then lapsed with the building still under construction: at the 26 August 2026 inspection the DLD register listed project 2382 as Active at 95.93%, still showing 30 June 2026, with no revised date registered. The scheduled handover is Q2 2026. The full sequence of AVA readings sits on the AVA at Palm Jumeirah construction updates hub.
The Independent Progress Monitoring Report dated 18 June 2026 states: "Enabling, foundation and substructure and superstructure completed. internal finishes, external envelope, MEP, external work and internal works progressing at different stages as well." Set against the 27 February 2026 report, the change is the superstructure: listed as progressing in February, it is recorded as completed in June, so the concrete frame above the 2 basements and ground floor was finished while envelope, MEP, and finishing work carried on.
AVA moved from 79.84% on 27 February 2026 to 91.02% on 18 June 2026, a gain of 11.18 points over 111 days, or about 3.02 points per 30 day month. That rate describes the February to June cycle only, a period in which the frame was closed out, and it is not a forecast of when the remaining 8.98 points will be recorded.
It was the first AVA reading in this series with the superstructure recorded as complete while internal finishes, MEP, and the external envelope progressed, the point at which the items a pre handover inspection examines, such as floor to ceiling glazing, private terrace pools, and smart home systems, begin to take their final form. At 91.02% on 18 June 2026 AVA sat well inside the usual booking window, and because the register still listed the project Active on 26 August 2026, that inspection remains ahead for AVA buyers.
No. The image at the top of this page is a project rendering, not a photograph of the site in June 2026. The site record is the set of 7 inspection photographs the DLD app lists with the 18 June 2026 report for project 2382, filed with an Independent Progress Monitoring Report marked "Independently inspected and progress audited for RERA"; those photographs can be viewed in the DLD app and are not reproduced here.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the June 2026 inspection record for AVA at Palm Jumeirah Dorchester Collection Dubai correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.