Select Group Construction Updates in Dubai

This page tracks Select Group construction updates across Dubai, from the Dubai Maritime City peninsula and Palm Jumeirah to Dubai Marina and Business Bay, each project measured against official RERA inspection data. For a portfolio built mostly around residential towers, the useful reading is the climb between two inspections rather than the completion quarter printed at launch.

Direct advisor access. Every message answered personally, never by a call center.

8Projects Tracked
5Select Group Communities
September 2026Latest Inspection
RERAVerified Progress Data
Recently Inspected

Latest Select Group Construction Updates

These are the Select Group projects with the most recent RERA inspections on record. Read each card as one point on a curve rather than a verdict: a tower that keeps climbing from one visit to the next is moving at the pace its completion date assumes.

Six Senses Residences The Palm beachfront residential buildings with landscaped pools, private beach, and Dubai skyline, construction updates. Presented by Tohid Fetrat

Six Senses Residences The Palm: West Crescent Branded Build Record

Six Senses Residences The Palm, Select Group's 162-residence West Crescent address, reached 100% at the 01 September 2026 inspection.

Construction Progress100%
Inspection01 September 2026
CompletionReady
Peninsula Four The Plaza tower view in Business Bay Dubai showing completed exterior architecture and landscaped surroundings during the June 2026 construction update Captured by Tohid Fetrat

Peninsula Four The Plaza: Dubai Canal Twin Tower Record

Peninsula Four The Plaza, Select Group's 1,025-residence twin towers on the Dubai Canal, went from 88.45% to 100% by June 2026.

Construction Progress100%
Inspection24 June 2026
CompletionQ3 2026
Six Senses Residences Dubai tower overlooking Palm Jumeirah during construction update phase Presented by Tohid Fetrat

Six Senses Residences Dubai Marina: 120-Floor Branded Tower Progress

Six Senses Residences Dubai Marina, Select Group's 251-residence tower on plot 162, moved from 21.3% to 25.02% by June 2026.

Construction Progress25.02%
Inspection18 June 2026
CompletionQ3 2028
Nautica Two by Select Group in Dubai Maritime City construction updates showing the waterfront tower overlooking the marina and Gulf in Dubai Presented by Tohid Fetrat

Nautica Two: Twin Nautica Tower on Plot 45

Nautica Two, Select Group's twin tower of 328 residences on plot 45, rose from 31.73% to 64.34% by April 2026.

Construction Progress64.34%
Inspection24 April 2026
CompletionQ4 2026
Nautica One by Select Group in Dubai Maritime City infinity pool and waterfront view for construction updates in Dubai Presented by Tohid Fetrat

Nautica One: First Maritime City Waterfront Tower Progress

Nautica One, Select Group's 328-residence waterfront tower in Dubai Maritime City, climbed from 32.35% to 64.57% by April 2026.

Construction Progress64.57%
Inspection24 April 2026
CompletionQ4 2026
Full Project Index

Select Group Construction Updates Directory

Every Select Group project tracked here carries its RERA progress, latest inspection date, and expected completion. The rows I question first are the quiet ones: an inspection date that has not refreshed in months, or a completion quarter drawing close while the percentage holds still.

Select Group construction updates directory with progress, inspection dates, and completion timelines
ProjectProgressInspectionCompletionReport
Six Senses Residences The Palm
100%
01 September 2026ReadyView Report
Peninsula Four The Plaza
100%
24 June 2026Q3 2026View Report
Six Senses Residences Dubai Marina
25.02%
18 June 2026Q3 2028View Report
Nautica Two
64.34%
24 April 2026Q4 2026View Report
Nautica One
64.57%
24 April 2026Q4 2026View Report
The Edge by Select Group at Business Bay
88.86%
23 April 2026Q3 2026View Report
Artistry Two Residences
0%
14 January 2026Q1 2029View Report
Artistry One Residences
0%
14 January 2026Q1 2029View Report

Progress figures reflect official RERA project inspection data.

By Community

Select Group Community Construction Updates

Select Group builds mostly on waterfront plots inside districts that already exist, from Dubai Marina and Business Bay to Palm Jumeirah and the Dubai Maritime City peninsula. What I check first in these districts is not the neighborhood but the building itself: its pace, its finishes, and how its handover is run.

Aerial panoramic view of Palm Jumeirah waterfront villas and island development during Palm Jumeirah Construction Updates in Dubai Presented by Tohid Fetrat

Palm Jumeirah Construction Updates: Trunk Towers to Shoreline Branded Residences

Palm Jumeirah construction updates follow apartment towers on the trunk and branded residences along shoreline of Nakheel’s island, against RERA data.

Projects1 Project
Latest UpdateSeptember 2026
View Palm Jumeirah Dubai Updates
Modern office towers and active construction cranes in Business Bay Dubai for Business Bay Construction Updates Captured by Tohid Fetrat

Business Bay Construction Updates: Canal Side Towers and Branded Residences

Business Bay construction updates follow tracked towers in Dubai’s canal side business district, from branded residences to offices, against RERA data.

Projects2 Projects
Latest UpdateJune 2026
View Business Bay Updates
Aerial waterfront view of Dubai Marina skyscrapers, canals, and luxury residential towers during Dubai Marina Construction Updates in Dubai Presented by Tohid Fetrat

Dubai Marina Construction Updates: New Towers in an Established Waterfront District

Dubai Marina construction updates follow new towers still rising in one of Dubai’s most established waterfront districts, measured against RERA data.

Projects1 Project
Latest UpdateJune 2026
View Dubai Marina Updates
Community Index

Select Group Community Construction Updates Directory

Each district below has its own construction updates page covering every tracked project inside it, whichever developer is building. Start with the district you are buying into: its page sets Select Group’s progress beside the other towers rising around it, which is the fairest benchmark for pace.

Select Group community construction updates directory with project counts and latest update months
CommunityProjectsLatest UpdateReports
Palm Jumeirah Dubai1 ProjectSeptember 2026View Community Updates
Business Bay2 ProjectsJune 2026View Community Updates
Dubai Marina1 ProjectJune 2026View Community Updates
Maritime City2 ProjectsApril 2026View Community Updates
Dubai Design District2 ProjectsJanuary 2026View Community Updates

Progress figures reflect official RERA project inspection data.

Construction Lifecycle

Select Group Construction Inspection Reports and Development Milestones

Every Select Group project passes through the same construction stages, from site mobilization to handover, whatever brand ends up on the building. The stage matters more than the percentage alone: it sets what the next inspection should reasonably show, and it explains why progress sprints during the structure and slows during fit-out.

  1. Initial Registration and Site Mobilization

    Project registration, escrow account setup, hoarding, and contractor mobilization come before the first excavator arrives. A reading near zero is expected here; the useful signal is how soon the site moves on to excavation.

  2. Excavation and Foundation Development

    Towers on waterfront plots typically need shoring, dewatering, and deep piling before the basement levels can be built. This stage looks slow from the street, and a long stall here tends to carry straight through to the handover date.

  3. Tower and Podium Construction Progress

    Podium levels rise first, then the tower climbs slab by slab, which is usually when the percentage moves fastest. A regular floor cycle between inspections is the clearest evidence that the structure is on schedule.

  4. Exterior Façade and Architectural Installation

    Curtain wall, glazing, balconies, and crown details close the building in, often while the upper floors are still being cast. Façade work is the easiest stage to check by eye, so it is a good moment to compare the RERA figure with the building itself.

  5. Interior Finishing and Lifestyle Infrastructure

    Apartment fit-out, MEP systems, lifts, and amenity floors run in parallel, and on branded residences the hospitality partner’s standards come into play as well. Progress slows here by nature, so a smaller jump between inspections is not by itself a delay.

  6. Final Inspection and Handover Preparation

    Authority inspections, testing and commissioning, and the building completion certificate come before the handover notice is issued. Once that notice arrives, the snagging inspection becomes the buyer’s leverage: defects recorded before key collection are fixed under the developer’s responsibility.

Not sure which stage your project is in? Send me the project name.

Check My Project Stage on WhatsApp
Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments Presented by Tohid Fetrat
Your Advisor

Who Is Tracking These Projects for You

I am Tohid Fetrat, a Dubai luxury real estate advisor based at The Opus by Omniyat in Business Bay. Every update on this page comes from data I personally verify before publishing.

  • 9+ years advising buyers across Dubai off plan and ultra luxury projects
  • Verified developer awards
  • Office at The Opus by Omniyat, Business Bay, Dubai
  • Updates verified against official inspection data before publishing
Buyer Insight

Why Select Group Construction Updates Matter for Property Buyers

A Select Group purchase off plan is usually a commitment to one building years before it is finished, so that building’s own construction record is the best evidence available on timing. For an end user that evidence shapes the move-in plan; for an investor it shapes when the first lease or resale can realistically happen.

  • RERA progress read as a trend across inspections
  • Early warning on towers where readings or inspections stall
  • Structure, façade, and fit-out stages tracked in order
  • Branded residence handovers followed from structure to keys
  • Snagging planned ahead of the handover notice
  • Rental and resale plans matched to realistic completion quarters
During Construction

What I Handle for Buyers While Their Project Is Being Built

Tracking progress is only one part of protecting an off plan purchase. These are the three areas buyers ask me to manage most.

Escrow Verification

Confirm your payments flow into the project’s registered escrow account and understand how your funds are protected during construction.

Snagging Inspection Support

Plan a professional snagging inspection before handover so defects are documented and fixed while the developer is still responsible.

Handover and Progress Tracking

Get the latest inspection data on your project, understand delay signals early, and prepare for a smooth handover process.

Interactive Map

Explore Select Group Construction Updates on Dubai Map

Track Select Group construction update locations across Dubai including marina towers, beachfront branded residences, and canal side developments connected to verified inspection activity and project progress reports.

Interactive Dubai real estate map preview
Click to view Select Group Construction Updates on Dubai Map
Developer Outlook

Select Group Waterfront Development Expansion

Select Group has grown by building inside Dubai’s established waterfront districts, with Dubai Marina and Business Bay at the core and further addresses on Palm Jumeirah and the Dubai Maritime City peninsula. My read is that the developer trades on location and hospitality partnerships rather than sheer volume, so each new building is judged on its own delivery more than on the size of the pipeline.

Branded residences run alongside the developer’s own towers, and the two are worth reading separately: one carries an operator’s service promise into the handover, the other stands on structure and finishes alone. For buyers, that means weighing each project’s inspection data on its own terms rather than as part of a portfolio average.

  • Waterfront tower delivery across every Select Group district
  • New launches followed from registration to handover
  • Branded and unbranded buildings compared on equal terms
  • A measured read on delivery pace before any commitment
Common Questions

Select Group Construction Updates FAQs

What are Select Group construction updates?

Select Group construction updates are progress reports on the developer’s Dubai projects that are still being built or have been completed, most of them residential towers. Each entry pairs the official RERA progress figure with its inspection date and expected completion, so momentum can be judged on evidence rather than marketing timelines.

Where does Select Group build in Dubai?

Select Group, established in 2002 and headquartered in Dubai, has developed projects in Dubai Marina, Business Bay, Palm Jumeirah, Dubai Maritime City, and Dubai Design District. Most of its residential work sits on waterfront plots in districts that already exist, so the roads, transport, and retail around a new building are usually in place well before handover.

How should the progress percentage on a Select Group tower be read?

The percentage reflects how much of the planned work was complete on the inspection date, across structure, façade, services, and finishes rather than height alone. A tower can look complete from the street while the figure is still some way short of complete, because interiors, lifts, and testing remain.

How often are Select Group projects inspected?

Inspection timing differs from project to project and is not published in advance. That is why every figure carries the date it was recorded: the age of a reading matters almost as much as the reading itself.

What does the expected completion date of a Select Group project mean?

The expected completion is the quarter registered for the project, not a confirmed handover date. Keys are released only after the building completion certificate and the developer’s handover notice, so the date is best tested against how the progress figure is moving.

How are payments protected while a Select Group project is under construction?

Under Dubai’s escrow rules, off plan installments are paid into an account registered for that specific project, and the developer draws on those funds as construction progress is verified. The practical safeguard for a buyer is confirming that every payment goes to the escrow account named for the project and no other account.

Question not covered here? Ask me directly.

Ask on WhatsApp

Direct advisor access. Every message answered personally, never by a call center.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments Presented by Tohid Fetrat
Tohid Fetrat

Want the next inspection report before it’s published? Message me.

Step 1You message me the project name on WhatsApp
Step 2I pull the latest verified inspection data
Step 3You decide with the full picture in hand

Direct advisor access. Every message answered personally, never by a call center.

Ask About Select Group