Ocean House Construction Updates: Envelope and Finishes on the Crescent
Track Ocean House construction progress through verified site inspections, key development milestones, and regular updates throughout the construction journey.

Verified Waterfront Construction Progress Across Dubai’s Palm Shaped Island
This page tracks Palm Jumeirah construction updates across Nakheel’s man made island, from apartment towers on the trunk to branded residences along the shoreline, with every project measured against official RERA inspection data. What matters most is pace: the movement between two inspections tells a buyer more about a handover date than any marketing timeline.
Each card shows a Palm Jumeirah project at its most recent RERA inspection, with the reading, its date and the expected completion side by side. The three belong together: a high percentage recorded months ago describes a site that has already moved on, rather than the building as it stands today.

Track Ocean House construction progress through verified site inspections, key development milestones, and regular updates throughout the construction journey.

Six Senses Residences The Palm, Select Group's 162-residence West Crescent address, reached 100% at the 01 September 2026 inspection.

Alba Dorchester Collection, OMNIYAT's 137-residence address behind 250 metres of Palm Jumeirah beachfront, logged 8.35% in September 2026.

I am Tohid Fetrat, a Dubai luxury real estate advisor based at The Opus by Omniyat in Business Bay. Every update on this page comes from data I personally verify before publishing.
The directory sets each tracked Palm Jumeirah project against three figures: RERA progress, the date of the latest inspection and the expected completion. Where those figures disagree, for example a completion quarter that has passed with work still outstanding, the gap is the question to put to the developer before the next payment.
| Project | Progress | Inspection | Completion | Report |
|---|---|---|---|---|
| Ocean House | 80.7% | 3 September 2026 | Q4 2026 | View ReportAsk |
| Six Senses Residences The Palm | 100% | 01 September 2026 | Ready | View ReportAsk |
| Alba Dorchester Collection | 8.35% | 01 September 2026 | Q4 2028 | View ReportAsk |
| AVA at Palm Jumeirah Dorchester Collection Dubai | 95.93% | 26 August 2026 | Q2 2026 | View ReportAsk |
| ORLA Dorchester Collection | 70.01% | 21 August 2026 | Q4 2026 | View ReportAsk |
| Palm Beach Tower 1 | 82.83% | 12 August 2026 | Q4 2026 | View ReportAsk |
| Como Residences | 20.88% | 06-07-2026 | Q3 2027 | View ReportAsk |
| Bella at Passo | 0% | 24 March 2026 | Q3 2029 | View ReportAsk |
| Passo | 0% | 24 March 2026 | Q3 2029 | View ReportAsk |
| ORLA Infinity, Dorchester Collection Dubai | 40.02% | 16 March 2026 | Q2 2027 | View ReportAsk |
| One at Palm Jumeirah Dorchester Collection | 100% | 20 June 2021 | Ready | View ReportAsk |
| Armani Beach Residences | 10.17% | 20-07-2026 | Q4 2027 | View ReportAsk |
Progress figures reflect official RERA project inspection data.
Following a project on this page? Just reply with a project name and I will send you the verified progress and inspection updates directly on WhatsApp as they are published.
Get My Project Updates on WhatsAppPalm Jumeirah projects move through the same seven stages as any Dubai build, with the waterfront adding its own layer: beach access, marine edges and shoreline works run alongside the buildings themselves. Knowing which stage a project has reached tells you what the next inspection ought to show.
Hoardings, contractor mobilization, authority approvals and utility planning come first, along with any coordination needed at the water’s edge. Readings stay close to zero for months at this stage, so the date of the first recorded inspection is the more useful signal.
Excavation, piling, retaining structures and foundations take shape below ground, work that shows little from the road. Time lost here rarely disappears: it tends to resurface later as a revised completion quarter.
The podium is cast and the structure rises floor by floor until the roof slab is complete. Readings should move visibly between inspections during the frame, so a flat result at this stage deserves a direct question.
Glazing, cladding, balconies and terraces close the building in, and from the water it starts to look finished. A complete exterior can still front several floors of unfinished interiors, so the percentage matters more than the view.
MEP systems, lifts, smart controls and apartment finishes are installed floor by floor. Increments shrink during fit out, which is normal; a reading that stops moving altogether is the signal worth acting on.
Beach access, pools, landscaping, drop off areas and road connections are completed around the building. On Palm Jumeirah this is where the waterfront promise is delivered, so a building finished without its beach or amenity deck is not yet the product that was sold.
Authority inspections, system testing and the completion certificate all have to be in place before keys are released. The handover notice then opens the snagging period, and defects recorded during it remain the developer’s to fix.
Most buyer disputes start between stages, not at handover. Knowing which stage your project is in is what makes an inspection worth booking.
Not sure which stage your project is in?
Check My Project Stage on WhatsAppPalm Jumeirah adds new homes in single buildings rather than whole new phases, so the timing of each completion carries real weight. An end user needs a move in quarter that holds; an investor needs to know when a unit can start earning and which nearby buildings complete in the same window.

Tracking progress is only one part of protecting an off plan purchase. These are the three areas buyers ask me to manage most.
Confirm your payments flow into the project’s registered escrow account, not anywhere else.
Ask About EscrowPlan a professional snagging inspection before you sign for handover.
Ask About SnaggingGet the latest inspection data on your project as it is published.
Ask About HandoverReview verified Palm Jumeirah construction update locations across branded residences, beachfront towers, luxury villas, hospitality developments, and active waterfront infrastructure projects connected to ongoing inspection activity and construction progress throughout Dubai.

Palm Jumeirah is Nakheel’s palm shaped island in the Arabian Gulf, laid out as a trunk, fronds and a crescent of beachfront resorts on a footprint that cannot grow. My read is that this fixed supply is why new construction here leans toward branded and ultra luxury residences rather than volume. For an end user that means fewer, more finished choices; for an investor it means a market where position on the island counts as much as the building.

Palm Jumeirah construction updates follow buildings on the island from early works to handover, using the progress figures recorded at official RERA inspections. Completed projects are also included. A buyer can see how far a project has advanced, when that was measured and when completion is registered, instead of relying on a launch brochure.
Supply on Palm Jumeirah is limited by the size of the island, so the timing of each new completion matters to anyone buying for rental income or resale. Construction pace shows an investor when a unit is likely to start earning and whether a slipping schedule could change that plan.
The updates cover residential projects under construction on the island, including branded residences, beachfront apartment buildings, waterfront towers and villa developments. Each one is measured through the same RERA inspection process, which makes their progress directly comparable.
Each project report is updated when a new RERA inspection is recorded for it, so the timing varies from one building to the next. The inspection date is therefore part of the figure: a reading taken several months ago describes a site that has since moved on.
Yes. Developers on Palm Jumeirah build under the same island conditions and are measured by the same RERA inspections, which makes their progress comparable on equal terms. A record of steady movement between inspections is stronger evidence of delivery capability than a launch announcement or a marketed handover date.
A report shows the latest RERA progress percentage, the inspection date it comes from, the registered completion date and the construction stage the project has reached. Read together, these figures show both where a building stands and whether its pace is consistent with the completion date on record.
Question not covered here? Ask me directly.
Ask Me About Your Project