
Ivory at DAMAC Hills: 57-Home Townhouse and Villa Record
Ivory at DAMAC Hills, DAMAC's cluster of 57 townhouses and villas, stood at 0.56% at mobilisation on 29 June 2026.

Verified Progress Across Villa Clusters, Golf Course Residences, and Apartment Buildings in DAMAC Hills
This page tracks DAMAC Hills construction updates across DAMAC’s first community development, a golf course community in Dubailand where new homes rise beside neighborhoods that are already lived in. That changes the buyer question: the finished community is visible next door, so the variable is the pace of each site, measured inspection by inspection.
The most recently inspected DAMAC Hills projects appear here, each linked to its full report and measured against official RERA inspection data. Read the inspection date before the percentage: a progress figure is only as reliable as the site visit behind it.

Ivory at DAMAC Hills, DAMAC's cluster of 57 townhouses and villas, stood at 0.56% at mobilisation on 29 June 2026.

Autograph Collection by DAMAC at DAMAC Hills covers 50 villas in Al Hebiah Third, with RERA recording 9.41% in June 2026.

GEMS Estates, DAMAC's collection of 15 branded villas in DAMAC Hills, read 62.64% in the DLD register on 14 April 2026.

I am Tohid Fetrat, a Dubai luxury real estate advisor based at The Opus by Omniyat in Business Bay. My office is inside this district, these are the cranes outside my window, and every update on this page comes from data I personally verify before publishing.
Every tracked DAMAC Hills project sits in this table with its latest progress reading, inspection date, and registered completion, linked to the full report. Look at the gap rather than the total: a completion date that is close while progress still trails is the line that deserves a second look.
| Project | Progress | Inspection | Completion | Report |
|---|---|---|---|---|
| Ivory at DAMAC Hills | 0.56% | 29 June 2026 | Q2 2028 | View ReportAsk |
| Autograph Collection by DAMAC at DAMAC Hills | 9.41% | 06 June 2026 | Q2 2027 | View ReportAsk |
| GEMS Estates | 62.64% | 14 April 2026 | Q4 2025 | View ReportAsk |
| Golf Greens at DAMAC Hills | 31.46% | 14 April 2026 | Q1 2027 | View ReportAsk |
| Golf Greens 2 by DAMAC at DAMAC Hills | 28.44% | 06 April 2026 | Q1 2027 | View ReportAsk |
| Golf Gate 2 at DAMAC Hills | 60.02% | 25 March 2026 | Q4 2026 | View ReportAsk |
| DAMAC District | 0.12% | 04 March 2026 | Q3 2029 | View ReportAsk |
| Golf Gate at DAMAC Hills | 100% | 12 February 2025 | Ready | View ReportAsk |
Progress figures reflect official RERA project inspection data.
Following a project on this page? Just reply with a project name and I will send you the verified progress and inspection updates directly on WhatsApp as they are published.
Get My Project Updates on WhatsAppEvery DAMAC Hills project passes through the same inspection stages, from mobilization to handover, but a villa cluster and an apartment building move through them at different rhythms. Knowing which stage a site has reached tells you which signal to watch next, rather than reading the percentage on its own.
The contractor takes over the plot, fences it, and sets up site offices and temporary utilities inside the existing community. The signal to watch is the first inspection that shows measurable progress, the point where a launch becomes a working site.
Excavation, piling, and foundation works fix the footprint of each villa row or apartment building. Steady movement between inspections suggests a fully mobilized contractor; a flat reading across several months is the early warning.
Concrete frames rise floor by floor on apartment buildings, while villa clusters see walls and roof slabs completed home by home. This stage carries a large share of the overall progress figure, so a slowdown here deserves a closer look.
Exterior walls, glazing, roofing, and façade finishes close each building in and set the view from the street and the golf course. Once a structure is weathertight, interior trades can work in parallel, which is often when a timeline tightens.
Mechanical, electrical, and plumbing systems go in alongside flooring, joinery, kitchens, and bathrooms. Finishing quality is decided at this stage, which is why snagging conversations belong before handover rather than after it.
Internal roads, landscaping, pools, and links to the wider DAMAC Hills network of parks and facilities are completed around the homes. A building can be ready while its surroundings are not, so both deserve a check before a handover date is accepted.
Authority inspections, completion certificates, and the snagging window come before the keys. The practical question at this stage is whether the unit you receive matches the specification you paid for.
Most buyer disputes start between stages, not at handover. Knowing which stage your project is in is what makes an inspection worth booking.
Not sure which stage your project is in?
Check My Project Stage on WhatsAppDAMAC Hills is an established community, so construction updates here are less about whether the area takes shape and more about when a specific cluster or building joins it. For an end user that timing decides a move date; for an investor it decides when rent starts and how a resale listing competes with finished homes nearby.

Tracking progress is only one part of protecting an off plan purchase. These are the three areas buyers ask me to manage most.
Confirm your payments flow into the project’s registered escrow account, not anywhere else.
Ask About EscrowPlan a professional snagging inspection before you sign for handover.
Ask About SnaggingGet the latest inspection data on your project as it is published.
Ask About HandoverSee where each DAMAC Hills project sits within the community, from golf course frontage to the villa clusters and apartment buildings around the parkland. Position inside the community shapes views, construction noise, and the walk to everyday amenities, so the map is worth a look before choosing a unit.

DAMAC Hills grows by adding new phases inside a community that already works, with the golf course, parkland, and everyday services in place before the next cluster launches. My read is that this is its real distinction from newer master plans: buyers judge each project against a finished neighborhood rather than a rendering.

DAMAC Hills construction updates track the progress of projects under construction and completed projects in DAMAC’s golf course community in Dubailand, using official RERA inspection data. Each report shows the latest progress reading, its inspection date, and the completion date on record, so a buyer can see how far a project has moved and how current that reading is.
New homes in DAMAC Hills are delivered inside a community that is already occupied, so the open question for an investor is timing rather than whether the area takes shape. Inspection readings show whether a project is keeping pace with its completion date, which decides when rental income can start and how a resale competes with finished homes nearby.
The updates cover residential projects under construction in DAMAC Hills, which can include villa collections, townhouse clusters, and apartment buildings around the golf course. Each project links to its own report with the full inspection record, so the page works as an index rather than a summary.
A DAMAC Hills report is updated when a new official inspection reading is recorded for that project. The inspection date shown beside each figure tells a buyer exactly how current the reading is, which matters more than the percentage on its own.
Yes. Comparing the latest progress reading with the completion date on record shows whether a project is on course or likely to need more time. A completion date that has passed while progress is still short of full completion is the clearest signal that the handover date will move.
Near completion, the remaining authority inspections are carried out and the developer issues a handover notice to buyers. The period before keys are accepted is the snagging window, when defects can be recorded and fixed while the developer is still responsible.
Question not covered here? Ask me directly.
Ask Me About Your Project