Beyond · Dubai Islands · Construction Update
HADO at SIORA Construction Update - June 2026
16 June 2026 Inspection Records Mobilization at HADO at SIORA, With a 0.01% DLD Register Reading
Mobilization work was progressing on site when RERA inspected HADO at SIORA on 16 June 2026, the pre-construction stage that comes before its three towers rise.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
HADO at SIORA Construction Snapshot
A DLD register reading of 0.01% on 16 June 2026 places HADO at SIORA in the pre-construction band, where the record shows a site being mobilized rather than a structure being built, and where escrow and registration checks outweigh any progress figure.
HADO at SIORA by Beyond
4210
Active
0.01%
16 June 2026
30 June 2026
678 residences
79,861.60 sq m
Q3 2029
Data source: Dubai Land Department project register reading dated 16 June 2026 and the RERA Independent Progress Monitoring Report of the same date, which records mobilization work progressing at site and prints no percentage of its own. The reading was 105 days old at the time of writing: re-verify project 4210 on Dubai REST before relying on it. The hero image is a project rendering, not a site photograph. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: June 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
HADO at SIORA Construction Progress Summary
The RERA report dated 16 June 2026 notes that, at the time of inspection, mobilization work was progressing at site, and the report's photographs show a cleared plot with site cabins, hoarding and a crane on site. On the same date the Dubai Land Department register logged 0.01% for project 4210; the previous register reading showed 0% (date not shown). The registered construction start is 30 June 2026.
- Project registered in the DLD register on 09 December 2025 as project 4210
- Trust account bank recorded for the project: Mashreq Bank PSC
- Mobilization work progressing at site on plot 3040, per the 16 June 2026 report
- RERA progress status recorded as Pre-Construction, Progressing
- Basement and ground level works under the B+G+21+R design
- Towers A, B and C, each rising through 21 residential levels
- The shared landscaped base, The Cove pool deck and ground-level retail units
- Handover of the 678 residences, expected in Q3 2029
Payment Linked Progress
What a 0.01% Register Reading Means for HADO at SIORA Buyers
HADO at SIORA instalments run by calendar date, not by construction milestone: on the developer's launch schedule, subject to its current terms, 10% + 4% DLD registration fee on booking, 10% one month later, 5% every May and November from 2026 to 2028, and 50% on completion. The 16 June 2026 reading triggers no payment by itself; it shows what those instalments are funding. At this stage, four actions matter most.
Verify the escrow account
Every instalment should go only to the DLD regulated escrow account registered for project 4210, with Mashreq Bank PSC recorded as the trust account bank. HADO at SIORA escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record, where the project is listed as Hado by Beyond.
Reread your SPA payment schedule
Check whether your sale and purchase agreement fixes instalments to calendar dates, as the launch schedule does, and how it defines completion for the 50% balance against the Q3 2029 expected handover. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the register readings.
Confirm your Oqood registration
Oqood is the Dubai Land Department's interim registration for an off-plan unit. Confirm that yours names the correct unit under project 4210, and that the 4% DLD registration fee paid at booking went to the Dubai Land Department, not into escrow.
Track the register readings
Each DLD reading after 16 June 2026 is added to the HADO at SIORA construction updates hub, so the first movement above 0.01% carries its own date when it appears.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at the Pre-Construction Stage?
Entering while the plot is still being mobilized means deciding from drawings and the developer's specification; the return is the longest instalment runway, with half the price left until completion. Every payment goes to the DLD-registered escrow account for project 4210, released against verified construction progress.
- Risk picture: mobilization recorded on site on 16 June 2026
- 50% of the price due on completion, expected Q3 2029
- Dated 5% instalments each May and November through 2028
- Structure visible and inspected before you commit
- A short wait between purchase and handover
- A larger share of the price due within months, not years
20+ units listed available on the project page as of this update; availability shifts between cycles.
About the Development
HADO at SIORA Project Details

When RERA inspected on 16 June 2026, HADO at SIORA by Beyond was a pre-construction site with mobilization recorded; the plan it prepares for is 678 residences across Towers A, B and C, each rising through 21 residential levels. Starting prices: AED 2.16M ≈ USD 588K.
For buyers entering at this stage, the trade off is the longest wait of any entry point against the lightest capital commitment during the build, with 50% due on completion and handover expected in Q3 2029.
HADO at SIORA by Beyond Project GuideSite Context This Cycle
Explore HADO at SIORA Location on Dubai Map
HADO at SIORA stands on plot 3040 inside Beyond's SIORA masterplan on Island B of Dubai Islands, with its three towers planned to open toward the water above a shared landscaped base. In June 2026 the RERA record placed that plot at mobilization, so this cycle describes a site being prepared, with the basement, ground level and tower works of the B+G+21+R design still to come.
Island B is still taking shape around the project: the developer's fact sheet describes Dubai Islands as reached by road and by sea and planned to host more than 80 hotels. For buyers at this stage, the island and the building mature on overlapping timelines, so occupancy or rental plans for Q3 2029 depend on the district's progress as much as on the towers. Pin the plot against other island launches on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in HADO at SIORA at the Pre-Construction Stage
Before the first foundations, residency planning and payment protection are the two decisions that cannot wait for the towers. Each resource below is matched to where HADO at SIORA stands right now.

HADO at SIORA Construction Updates
This page: the 16 June 2026 register reading and mobilization record for HADO at SIORA.

HADO at SIORA Golden Visa: Five Layouts, Every One Above
Beyond's HADO at SIORA, 678 residences in three towers on Island B, qualifies at every layout from the 1 bedroom apartment.
Read HADO at SIORA Golden Visa Guide
HADO at SIORA Escrow Account
Confirm the Mashreq Bank PSC escrow account for project 4210 before any upcoming HADO instalment.
Verify HADO at SIORA Escrow AccountUpdate Timeline
Other HADO at SIORA Construction Updates
June 2026 is the first monthly report for HADO at SIORA; later register readings are added to the hub as the Dubai Land Department records them.
Where This Update Fits
Explore HADO at SIORA Structure
This monthly record sits inside a wider picture: the Island B market the towers will join, the island around the plot, and the developer behind the project.

Island B: Seven Waterfront Projects by Nakheel, Ellington and Beyond
Island B, on the eastern side of Dubai Islands, is a villa and beachfront residence district with seven projects for sale.
See Island B Properties for Sale
Island B Community Overview
Discover Island B within Dubai Islands, featuring waterfront residences, beach access, hospitality destinations, promenades, and planned lifestyle infrastructure by Nakheel.
Explore the Island B Community
Beyond Developments: Omniyat's Design DNA on the Dubai Maritime City Waterfront
Beyond brings Omniyat's design DNA to waterfront communities in Dubai Maritime City and Palm Jumeirah, with every project along the coast.
View the Beyond Developer ProfileFAQs
HADO at SIORA Construction Progress in June 2026: Frequently Asked Questions
The Dubai Land Department project register recorded a reading of 0.01% for HADO at SIORA, project 4210, on 16 June 2026, while the RERA progress indicator for the same inspection read Pre-Construction, Progressing. Register readings change between inspection cycles, so re-verify project 4210 on Dubai REST for any figure dated after 16 June 2026.
HADO at SIORA is expected to hand over in Q3 2029, and as of the 16 June 2026 record the DLD register listed 30 June 2029 as the registered completion date. Registered dates can be revised between inspection cycles, so every later update states the date current at its own reading. How readings and registered dates are followed over time is covered in the HADO at SIORA construction updates guide.
The RERA Independent Progress Monitoring Report dated 16 June 2026 states that, at the time of inspection, mobilization work was progressing at site. It describes the project as Mixed Use (Residential - Retail) B+G+21+R, which reads as a basement, a ground level, 21 upper levels and a roof, and it prints no percentage of its own.
On the developer's launch schedule of record, a buyer who had booked in time for the 01 May 2026 instalment had 25% of the price scheduled by the 16 June 2026 inspection: 10% on booking, 10% one month later and 5% on 01 May 2026, with the 4% DLD registration fee paid separately to the Dubai Land Department. The register reading on that date was 0.01%. This is arithmetic on the published schedule, not a forecast, and each buyer's SPA and the developer's current terms set the actual amounts.
On the developer's launch schedule, the next dated instalment after the 16 June 2026 reading is 5% on 01 November 2026, followed by 5% each May and November through 01 November 2028 and 50% on completion, anticipated by Q3 2029. These instalments are set by calendar date rather than by construction stage, so they fall due regardless of the next register reading; the dates in each buyer's own SPA govern.
In the Dubai Land Department register and the 16 June 2026 RERA report, the project appears as Hado by Beyond, project number 4210, on plot 3040, with Mashreq Bank PSC recorded as the trust account bank. Searching Dubai REST by the project number 4210 is the most direct way to find the same record.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the June 2026 inspection record for HADO at SIORA correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.