Bugatti Residences Construction Updates, Business Bay Plot 83
Bugatti Residences is Binghatti's branded tower of 184 residences in Business Bay, logged at 65.57% at the 23 September 2026 inspection.

This page tracks Binghatti construction updates across Dubai, from branded towers in the city core to the developer’s own master planned communities, with every project measured against official RERA inspection data. Binghatti designs and builds in house, so the real signal is consistency: how evenly its sites move between inspections says more about handover than any launch date.
Each card shows a recently inspected Binghatti project with its verified progress, the date of the reading and the expected completion side by side. The date matters as much as the figure: a high percentage from an old inspection says less about the site today than a modest one recorded last month.

Bugatti Residences is Binghatti's branded tower of 184 residences in Business Bay, logged at 65.57% at the 23 September 2026 inspection.

Binghatti Luxuria, Binghatti's 457-residence tower in Jumeirah Village Triangle, read 7.04% at the 17 September 2026 inspection under DLD project 4299.

Binghatti Etherea, a 282-residence Binghatti tower in Jumeirah Village Circle, read 7.24% on 15 September 2026 at foundation level.

Binghatti Twilight stacks 228 residences above office floors in Al Jaddaf, reaching 55.41% on the DLD register on 14 September 2026.
Vision Iconic at Mercedes-Benz Places, tower 6 of Binghatti City with 1,426 residences, opened its record at 0% in July 2026.
The directory lists Binghatti projects with their verified progress, latest inspection date and expected completion, each linked to its full construction report. Read completion against progress rather than either one alone: a project close to its handover quarter with a large share of work still open is the one I question first.
| Project | Progress | Inspection | Completion | Report |
|---|---|---|---|---|
| Bugatti Residences | 65.57% | 23 September 2026 | Q4 2026 | View Report Ask |
| Binghatti Luxuria | 7.04% | 17 September 2026 | Q3 2027 | View Report Ask |
| Binghatti Etherea | 7.24% | 15 September 2026 | Q3 2027 | View Report Ask |
| Binghatti Twilight | 55.41% | 14 September 2026 | Q1 2026 | View Report Ask |
| Vision Iconic at Mercedes-Benz Places | 0% | 28 July 2026 | Q4 2028 | View Report Ask |
| Binghatti Ruby | 46.43% | 23 July 2026 | Q4 2026 | View Report Ask |
| Binghatti Moonlight | 19.24% | 29 June 2026 | Q2 2026 | View Report Ask |
| Binghatti Flare | 20% | 19 June 2026 | Q3 2027 | View Report Ask |
| Binghatti Starfall | 0% | 20 May 2026 | Q3 2028 | View Report Ask |
| Binghatti Wraith at Al Jaddaf | 0% | 20 May 2026 | Q4 2027 | View Report Ask |
| Binghatti Starlight | 63.11% | 14 May 2026 | Q1 2026 | View Report Ask |
| One | 50.21% | 14 May 2026 | Q1 2027 | View Report Ask |
| Binghatti Aquarise | 21.04% | 14 May 2026 | Q4 2027 | View Report Ask |
| Binghatti Amberhall | 38.03% | 30 April 2026 | Q4 2026 | View Report Ask |
| Binghatti Circle | 10.33% | 30 April 2026 | Q2 2027 | View Report Ask |
| Binghatti Skyhall | 31.14% | 30 April 2026 | Q1 2027 | View Report Ask |
| Mercedes-Benz Places | 65.25% | 28 April 2026 | Q4 2026 | View Report Ask |
| Binghatti Skyrise | 22.4% | 23 April 2026 | Q4 2027 | View Report Ask |
| Binghatti Skyblade | 17.06% | 21 April 2026 | Q4 2027 | View Report Ask |
| Binghatti Spectre | 0% | 9 February 2026 | Q4 2028 | View Report Ask |
| Vision Maybach Ultimate Luxury Residences | 0% | 29 December 2025 | Q2 2028 | View Report Ask |
| Vision Mercedes-Maybach 6 Residences | 0% | 29 December 2025 | Q4 2028 | View Report Ask |
| Burj Binghatti Jacob & Co Residences | 34.56% | 22 December 2025 | Q2 2027 | View Report Ask |
| Binghatti Cullinan | 0% | 25 November 2025 | Q2 2027 | View Report Ask |
Progress figures reflect official RERA project inspection data.
Following a project on this page? Tell me which ones and I will send you the verified progress and inspection updates directly on WhatsApp as they are published.
Get My Project Updates on WhatsAppBinghatti projects are spread across several Dubai communities, from tower districts in the city core to the developer’s own master planned communities further out. Each community page sets the developer’s sites against the wider district picture: value at handover depends on the neighborhood as much as on the building.

Business Bay construction updates follow tracked towers in Dubai’s canal side business district, from branded residences to offices, against RERA data.
View Business Bay Updates
Jumeirah Village Triangle construction updates follow new private developer buildings beside a lived in Nakheel villa core, using RERA data.
View Jumeirah Village Triangle Updates
Jumeirah Village Circle construction updates compare independent developers building plot by plot inside Nakheel’s master plan, using RERA data.
View JVC UpdatesThe community index shows how many tracked Binghatti projects sit in each community and when the latest update was recorded. A community whose latest update is several months old is a prompt to ask for a fresh reading before relying on the figures.
| Community | Projects | Latest Update | Reports |
|---|---|---|---|
| Business Bay | 6 Projects | September 2026 | View Community Updates |
| Jumeirah Village Triangle | 2 Projects | September 2026 | View Community Updates |
| JVC | 4 Projects | September 2026 | View Community Updates |
| Al Jaddaf | 7 Projects | September 2026 | View Community Updates |
| Binghatti City | 3 Projects | July 2026 | View Community Updates |
| Downtown Dubai | 2 Projects | April 2026 | View Community Updates |
Progress figures reflect official RERA project inspection data.
Binghatti projects pass through the same regulated stages as any Dubai off plan building, and with design and construction handled in house, the developer sets the pace between them. Each stage below comes with the signal worth watching, so a progress figure reads as a point in the build rather than a number on its own.
The project is registered, its escrow account opened and the construction team mobilized, with hoarding, utilities and early ground works. Watch how soon the first inspection follows registration: a long gap usually means the site is waiting on approvals rather than building.
Excavation, shoring, piling and the foundation take the site below ground, where the percentage moves slowly even when work is intense. A small change between two inspections is normal here; a site that stays quiet for several months is not.
Podium and tower floors are cast cycle by cycle, and this is where the progress figure climbs fastest. The floor cycle tells you more than the headline percentage: a steady rhythm of slabs is the clearest sign that the completion quarter is realistic.
Façade panels, glazing, balconies and exterior detailing close the building envelope so interior trades can start. Compare the top structural floor with the highest finished façade floor: a gap that keeps widening usually pushes finishing work, and the handover, back.
Fit out, MEP systems, lifts, amenities and the roads and landscaping around the plot move toward completion. Progress often slows here even on healthy sites, because trades finish in sequence; the signal to watch is whether utility connections keep pace.
Authority inspections, the completion certificate and handover notices bring the project to delivery. This is the stage to plan a snagging inspection, because defects recorded before you take the keys remain the developer’s responsibility to fix.
Not sure which stage your project is in? Send me the project name.
Check My Project Stage on WhatsApp
I am Tohid Fetrat, a Dubai luxury real estate advisor based at The Opus by Omniyat in Business Bay. Every update on this page comes from data I personally verify before publishing.
Binghatti usually has many projects under construction at once, yet a buyer’s exposure is to one specific site rather than to the portfolio as a whole. For an end user the updates show whether the handover quarter still fits a move; for an investor they show when rental income can realistically begin and how much construction risk remains.
Tracking progress is only one part of protecting an off plan purchase. These are the three areas buyers ask me to manage most.
Confirm your payments flow into the project’s registered escrow account and understand how your funds are protected during construction.
Ask About EscrowPlan a professional snagging inspection before handover so defects are documented and fixed while the developer is still responsible.
Ask About SnaggingGet the latest inspection data on your project, understand delay signals early, and prepare for a smooth handover process.
Ask About HandoverTrack Binghatti construction update locations across Dubai including branded towers, residential high rises, and master planned communities connected to verified inspection activity and project progress reports.

Binghatti began as a contractor and still designs, builds and delivers in house, so the pace of its expansion rests on its own construction teams rather than on outside contractors. Its towers run from Jumeirah Village Circle and Dubai Science Park to branded addresses in Business Bay and Downtown Dubai. Binghatti City and Tilal Binghatti take it further, into master planned communities of its own.
My read is that the master communities change the risk picture more than the branded towers do: a phased community depends on roads, parks and utilities arriving on time, not just on one building topping out. For end users that means watching infrastructure alongside each project’s own percentage; for investors it means pricing the early phases on delivery evidence rather than on the masterplan render.
Binghatti construction updates are progress reports on Binghatti projects in Dubai, based on official RERA inspection data. Each report shows the latest progress percentage, the inspection date and the expected completion, so a buyer can see where a project actually stands rather than relying on sales material.
Many off plan payment plans are linked to construction stages, and handover planning depends on how fast a site is really moving. Verified updates show whether progress matches the payment schedule and reveal a slipping completion date early, while there is still time to plan around it.
Binghatti describes itself as a vertically integrated developer that began as a contractor, with design, development, construction and delivery handled in house. A project’s pace therefore depends largely on the developer’s own construction teams rather than an outside contractor, which makes the change between inspections a direct read on its execution.
The updates cover Binghatti residential towers, branded residences and phases within the developer’s master planned communities across Dubai. Each tracked project links to its own construction report, and the list changes as projects are added and handed over.
The percentage is the share of the project’s construction completed at the date of the last official RERA inspection. It measures the whole build rather than the visible structure, so a tower that looks topped out can still sit well short of completion while facade, fit out and services are finished.
Updates follow the official RERA inspection cycle, and the gap between inspections varies by project and stage, from about a month to several months. The inspection date beside each figure shows how recent the reading is, and an older date is a reason to treat the percentage with caution.